The part the truck may use when new, set in BMS software. Published shares run 80.0% to 95.7%; no standard sets one.
Of the hundred specification errors the curriculum is built against, 3 involve this term directly. Ranked by weighted risk index.
Fuel or energy storage is sized from nominal capacity rather than usable mission range
Taught in ENG-309.3 — Usable energy, reserve and degradationCharging power, dwell window, concurrency and site electrical capacity are not reconciled
Taught in ENG-309.6 — Charging acceptance and depot powerE-02 EV depot/charging infrastructure spec errors
Powertrain, fuel & thermal $9,000 – $45,000 per incident, typically caught in service, over years. Regulatory, lifecycle & emerging $2,000 – $16,000 per incident, typically caught inspection or enforcement. How the hundred were built →
This term appears in 1 of the fourteen Level 100 modules. What the course teaches is which document establishes it, what it does not extend to, and what it costs when someone treats it as something it is not.