A fact about
The field that records what a number describes: a document, a design, a setting, a sign on a date, a measured load.Taught in CVT-102, CVT-103
A(8)
Daily whole-body vibration exposure, scaled to an 8-hour day, in m/s².Taught in CVT-109
ABS
Controls wheel slip by releasing and reapplying a brake about to lock; four sensors, four modulators. Adds no grip.Taught in CVT-108
ACAxle to back of cab
Distance from the front axle centerline to the rear face of the cab. Used to locate a body's forward edge relative to the front axle.Taught in CVT-102, CVT-103, CVT-104 +10 more
Acceptance by conduct
Model-text acceptance without a signature: signals or acts after a chance to inspect, or no rejection.Taught in CVT-112
Acceptance gate
Five steps in order: label, empty weigh, compare, loaded weigh in the worst states, decide.Taught in CVT-104
Accountable (A)
Signs the decision and answers for it. Exactly one per decision; always on the buyer’s side for a buyer decision.Taught in CVT-112
Ackermann
Geometry that turns the outside front wheel less than the inside one, so both roll around one center (42.6° at 50° here).Taught in CVT-109
Actual gross weight
What the vehicle weighs right now, established only by weighing it. Changes with fuel, occupants, cargo, tools, and equipment.Taught in CVT-102, CVT-103, CVT-104 +10 more
Addendum
A written change or answer sent to every bidder while the RFQ is open; it joins the baseline.Taught in CVT-112
Advisory speed
The speed on a curve-warning plaque: a road owner's number, set by its own method, not this truck's limit.Taught in CVT-109
AF · CE · EOFafter-frame · cab to end of frame
Rear axle centerline to end of frame (after-frame, the frame overhang); back of cab to end of frame (CE = CA + AF); the end of frame as a point.Taught in CVT-103
AF · EOFafter-frame · end of frame
Rear axle centerline to the end of frame. Frame overhang, printed as AF, “Axle to Frame”, CE − CA or OH.Taught in CVT-103
Aging floor
The share of new usable energy a plan assumes is left late in the pack's life: 80% (CVT-114 convention).Taught in CVT-111
AHJauthority having jurisdiction
The official or office that adopts a code edition and decides what it asks of a site: usually the fire marshal and the building official.Taught in CVT-111
Air compressor, steering pump
Engine-driven on a diesel; own motors on the bus here, on with the key.Taught in CVT-114
Air dryer and purge
The desiccant dryer that takes water out of the air, and the dried air it spends cleaning itself at each cut-out.Taught in CVT-108
Air-brake restriction
The note the CDL rule puts on a license when the driver fails the air-brake test or tests in a vehicle without air brakes.Taught in CVT-108
Air-over-hydraulic
Air drives a booster that pushes a hydraulic master cylinder. FMVSS 121 counts it as an air brake system.Taught in CVT-108
All-in percentcount heat once
A weather row that already holds cab and pack heat; add no heater kilowatts.Taught in CVT-114
All-in rate
A cold rate from whole-trip results; it holds cab and pack heat while moving. What else it holds depends on the window it was metered over.Taught in CVT-114
Allowanceplug line
One round number standing in for lines nobody itemized. Audited first, because nobody has to defend it.Taught in CVT-104
Alterer49 CFR 567.7
A party modifying a certified complete vehicle before first retail sale, required to add its own label addressing rating or type changes caused by the alteration.Taught in CVT-101, CVT-102, CVT-103 +11 more
Alterer labelfederal label rule
Added beside the original: who altered, when, and only the ratings or type that changed.Taught in CVT-101
Alternator idle point
The maker's output near 1,600–2,000 alternator rpm, 55–90% of the rating. Alternator rpm = engine rpm × pulley ratio.Taught in CVT-110
Ambiguity protocol
The three-part output issued when evidence will not resolve a placement: primary, secondary, and unresolved — where "unresolved" names the specific requestable evidence that would move the placement, and who holds it.Taught in CVT-101, CVT-102, CVT-103 +11 more
AMTautomated manual transmission
A manual-type gearbox whose clutch and shifts are worked by a controller.Taught in CVT-107
Applicability
This VIN, configuration and date (and jurisdiction).Taught in CVT-101
Applicability fingerprint
The identity and scope keys that define where a claim may be reused: VIN, model, year, configuration, build stage, jurisdiction, route. What stops a correct claim migrating onto the wrong vehicle.Taught in CVT-102, CVT-103, CVT-104 +10 more
Applicability result
Applies, partly, does not apply or unknown, set and dated by the owner.Taught in CVT-112
Applicability score
Whether the source covers this vehicle, this configuration, this jurisdiction and this date. Scored separately from authority. A high authority score never rescues a failed applicability score.Taught in CVT-102, CVT-103, CVT-104 +10 more
Application approval
The maker's written acceptance of one engine–transmission pair for one duty. A request until it returns.Taught in CVT-107
Application Type™Level 3
Looked up after the family.Taught in CVT-101
Applied stroke
How far the pushrod comes out with the brake fully applied.Taught in CVT-108
Apportioned registration
One registration shared among member jurisdictions.Taught in CVT-101
AR steel
abrasion-resistant plate; wears two to three times slower than mild steel on makers' calculations.Taught in CVT-113
Articulation
How far a suspension lets its axles twist over uneven ground; printed as diagonal wheel travel.Taught in CVT-109
Assumption
A value adopted on purpose, on a stated basis the owner accepts, so work can proceed before evidence arrives: range, basis, carrying, owner, retiring request and expiry.Taught in CVT-102, CVT-103
Assumption vs invention
An assumption is a bounded, testable temporary value adopted about a known case, carrying an evidence request. An invention is a value with no referent — nothing constrains it and nothing could ever confirm or refute it. Labeling does not convert the second into the first.Taught in CVT-102, CVT-103, CVT-104 +10 more
At, under, over
A reading at its figure is at it, not over; “≤ X” fails only above X. Margin = figure minus load.Taught in CVT-105
Atomic claim
The smallest proposition that can carry one claim ID, one evidence basis, one disposition, one locator, one scope note and one dependency set. Tags hold claims; tags do not have evidence states of their own.Taught in CVT-101, CVT-102, CVT-103 +11 more
Authority score
Whether a source is the kind that can settle the kind of question being asked. Always relative to a question; never absolute.Taught in CVT-102, CVT-103, CVT-104 +10 more
Availability
Days a truck was ready over the days counted. The base and the list of what counts as down must be stated.Taught in CVT-114
Available payloadorder-record figure
A planning figure on an order worksheet: ratings minus estimated tare. Neither a rating nor a weighed mass; audited in CVT-104.Taught in CVT-102, CVT-103
Awarenotice, stop, keep back, report
Everyone else near the trucks. Never handles damaged or orange parts.Taught in CVT-114
Axle centerreference point
Where every spacing and L is measured. Never a tire edge, a hub face or the tandem center.Taught in CVT-105
Axle ratiofinal-drive ratio
The last torque multiplication before the wheel. Numerically higher (deeper) means more torque and higher RPM at a given speed; numerically lower (faster) means lower RPM and less multiplication.Taught in CVT-102, CVT-103, CVT-104 +10 more
Axle roles
Steer, drive (torque), non-driven, lift (retractable non-driven), pusher (non-driven ahead of drive), tag (non-driven behind drive).Taught in CVT-102, CVT-103, CVT-104 +10 more

B

B10
The mileage 90% of an engine population reaches without overhaul in the maker's assumed duty. A population claim, not one engine's life.Taught in CVT-107
Balance point
The deceleration where ideal equals installed: 0.49 g loaded; none empty.Taught in CVT-108
Ballast
Weight added deliberately for traction or stability. Real mass on the axles — it consumes payload and axle capacity like any other load.Taught in CVT-102, CVT-103, CVT-104 +10 more
Band
The range a model result moves through when its bounded inputs run at their limits.Taught in CVT-104
Band it, break it, move it
The two-sentence defense, every price dated.Taught in CVT-114
Band, reversal point
The plausible range of a weak value, and the value at which the decision it carries flips.Taught in CVT-112
Base speedelectric motor
The motor speed where full torque ends and constant power begins.Taught in CVT-107
Baseline changeengineering change
A change to the baseline itself; units and documents from the point it names follow the new version.Taught in CVT-112
Baseline in force
The current approved version on the decision date, whatever an old copy says.Taught in CVT-112
Baseline version
A numbered, dated state of the approved baseline with its reason and approver. Superseded versions stay readable.Taught in CVT-112
Basis
What a number was measured on: which load state, which stretch of route, air or product temperature. Numbers on different bases cannot be compared.Taught in CVT-102, CVT-103
Battery weight
Pack weight per kWh of nameplate: about 11 to 16 lb for heavy-duty packs.Taught in CVT-114
BBCBumper to back of cab
Longitudinal distance from the front bumper to the rear face of the cab.Taught in CVT-102, CVT-103, CVT-104 +10 more
Benchmark
A rule's number used to judge a vehicle the rule does not name, labeled as a benchmark, never as a finding.Taught in CVT-109
BFAbumper to front axle
From the bumper face to the steer-axle centerline; BFA = BBC − AC.Taught in CVT-103
BFA · AC · BBC · BOC
Bumper to front axle; front axle to back of cab; bumper to back of cab (BBC = BFA + AC); the back of cab as a point.Taught in CVT-103
BFA · AC · BBC · BOC · WB
Bumper to front axle; front axle to back of cab; bumper to back of cab; back of cab (a point); wheelbase. BBC = BFA + AC; WB = AC + CA.Taught in CVT-103
BFA · AC · BBC · CA · WB
Bumper to front axle; front axle to back of cab; bumper to back of cab; back of cab to rear axle; wheelbase.Taught in CVT-103
Blast radiusof a request
The entries and decisions on the sketch that change if a request comes back with a different value.Taught in CVT-103
BMS
Battery management system: the pack’s computer; it sets how much power may leave or enter.Taught in CVT-114
BOCback of cab
A point: the true rear of the cab structure, where CA starts. Not the rear face of equipment standing behind the cab.Taught in CVT-103
Body connection / gateway
The defined tap where body devices join the network, with a listed set of messages; and the device that keeps the powertrain network apart from it.Taught in CVT-110
Body overhang
Body length behind the rear axle centerline. Not the frame overhang, which is AF.Taught in CVT-103
Body-builder book
A chassis maker’s guidance for later stages; part of the IVD when incorporated by reference.Taught in CVT-101
Body-builder module
The chassis module that takes the body's switch inputs, runs the OEM's programmed logic and interlocks, and drives status outputs. Q-1's has 6 inputs and 6 outputs.Taught in CVT-110
Body-load reaction
What a support carries of the body's loads alone, chassis excluded. Never an axle load.Taught in CVT-106
Body-mounting drawing
The body builder's drawing of how the body, subframe and hoist sit on the chassis, with service points marked.Taught in CVT-113
Book-equivalent cut
The cut at which the calibrated geometry reproduces a book's number (52.4° here). A fitting result: not the book's basis, and not the set cut.Taught in CVT-109
Booster
A mixer’s trailing axle behind the drives, specified to stretch the outer bridge.Taught in CVT-105
Boundon a state never weighed
A limit the screen can prove without the split. Raised at 66,000, group 1–3 carries all of it against 52,500, and the tandem carries 66,000 less a steer that held 18,800 and can only gain.Taught in CVT-105
Bound of a stop
The stop screened at both ends of the drop: departure at the start, empty at the end.Taught in CVT-108
Bounded assumption
A value with its range, owner and the request that would retire it. Without bounds, an invention.Taught in CVT-112
Bounded range
The ledger total with every uncertain line at its low end and at its high end: here 19,364–20,828.Taught in CVT-104
Bounding state; point load
Bounding: loaded, pusher raised, the travel line the screen relies on. Point load: one position, like the hoist base at the start of the lift; a bound, since mounts spread it.Taught in CVT-106
Brake lag
The model's constant-speed delay before braking. FMVSS 121 times air from a 100 psi start to 60 psi at the chambers, 0.45 s on trucks; real torque starts building sooner. Hydraulic brakes have a short delay too.Taught in CVT-108
Brake thermal efficiency
The share of fuel energy that leaves the flywheel as work. Always name its state: peak, cruise or cycle average.Taught in CVT-107
Break-even density
Cargo room divided by the trailer’s usable cube, in lb per cubic foot; denser freight weighs out.Taught in CVT-114
Break-even rate
The rate at which the longest day uses exactly the floor energy after the hill and named loads: the floor line’s flip rate.Taught in CVT-114
Breakeven haul days
the season length at which cost per ton meets the haul rate.Taught in CVT-113
Bridge FormulaFormula B
W = 500 [LN/(N−1) + 12N + 36]: the most a group of N consecutive axles may carry over L feet between its end axles. Read in 105.3.Taught in CVT-105
BSFC
Brake-specific fuel consumption: fuel per unit of work, g/kWh = 3,600 ÷ (BTE × 42.7).Taught in CVT-107
Build sheet
The plant's list of components for one chassis. FACT about the components ordered; not a rating.Taught in CVT-104
Build slot, lead time
The production week a chassis is assigned, and the weeks from order to that week. Volatile: always written with its date.Taught in CVT-112
Built weight (tare)
What the finished truck weighs empty; it sets the payload under a legal ceiling.Taught in CVT-113
Bulk drum temperature
The average temperature through a drum's iron, which the screen's model tracks; never measured here.Taught in CVT-108
Buyer side, seller side
Buyer side: the account’s people and the spec professional it engaged. Seller side: the dealer rep and the body builder.Taught in CVT-112

C

CACab to axle
Distance from the back of cab to the rear axle centerline. The primary number for whether a given body length fits a given chassis.Taught in CVT-102, CVT-103, CVT-104 +10 more
CA · usable CA
CA is the document's back of cab to rear axle centerline. Usable CA is the case's term: CA minus the space the body cannot use behind the cab.Taught in CVT-103
CA · WBcab to axle · wheelbase
CA runs from the back of cab to the rear axle reference; WB = AC + CA. Always the document’s numbers, read for one configuration.Taught in CVT-103
CA, CE, AFthis lesson's uses
CA: back of cab to rear axle centerline (the axle's station, 214). AF: rear axle centerline to end of frame (110). CE: back of cab to end of frame, CA + AF (the frame end's station, 324).Taught in CVT-103
Cab form
Conventional, cabover, low-entry, extended, crew or sleeper. It sets BBC and, with the steer-axle position, AC.Taught in CVT-103
Cab forms
Conventional (engine ahead of cab), cab-over-engine / forward-control (cab over the engine), low-entry (low-floor forward-control), and chassis cab (cab + chassis delivered without a body).Taught in CVT-102, CVT-103, CVT-104 +10 more
Cab transition
One exit from or one entry into the cab. A stop is at least two; a trip back for paperwork makes four.Taught in CVT-109
Cab-to-body gap
Back of cab to the body's front wall. The 4 in OEM minimum is a floor; a reefer's gap comes from the unit maker's install drawing.Taught in CVT-103
Calendar days
This module’s interval convention: every day counts, weekends included.Taught in CVT-112
Campaign reflash
A maker-issued software update loaded by the dealer at a shop visit, usually logged by campaign number rather than by the settings it touched.Taught in CVT-110
Can't tell yet
The call when an input's range straddles the boundary; it carries its flip value, the input value at which the call changes, and its request.Taught in CVT-107, CVT-114
Candidate verdicts
Fails, meets as stated, or unresolved, applied line by line. Never “passes,” “legal” or “compliant.”Taught in CVT-102, CVT-103
Capital line / operating line
Price less the present value of the resale, spread over the years kept (falls with age); repairs plus downtime, levelized (rises with age).Taught in CVT-113
Capstone drift
A line whose evidence state changes between the lesson that built it and the summary that quotes it.Taught in CVT-107, CVT-108, CVT-109
Carbon intensity
Well-to-wheel g CO2e per MJ of fuel under one program's method; negative when it credits avoided methane.Taught in CVT-111
Cargo densityCALC-101-CARGO-DENSITY
Cargo mass divided by occupied cargo volume. Must state whether the volume is bulk, packed or nominal, or it cannot be compared with anything.Taught in CVT-102, CVT-103, CVT-104 +10 more
Cargo room
The gross ceiling that applies, less the weighed tractor and trailer: gross-based headroom. Axle, bridge and rating checks are separate.Taught in CVT-114
Carried as builtcapstone propagation
A line enters the summary at the state its entry gave it, or weaker; never stronger.Taught in CVT-105
Carried line
A ledger line naming what rides in service, with its weight and position, in place of an allowance.Taught in CVT-104
Carrying
The decisions that rest on an assumption and would reopen if it moved.Taught in CVT-102, CVT-103
Catalog cut
The cut a book or brochure prints: a fact about the document, not the built truck.Taught in CVT-109
Catalog cut, set cut
The wheel cut a book prints, and the cut the stops allow on the built truck, measured at delivery.Taught in CVT-109
CDL group
A, B, or C under 49 CFR Part 383, establishing what a driver is qualified to operate. A property of the person, evaluated against a vehicle or combination.Taught in CVT-102, CVT-103, CVT-104 +10 more
Cd·A, Crr
Drag area and rolling-resistance coefficient: the planning values behind air and rolling force.Taught in CVT-107
CEcab to end of frame
Back of cab to the end of frame; CE = CA + AF inside one convention.Taught in CVT-103
Ceilingthis module's use
A maximum some authority set: a rating or a road limit. The one a load reaches first binds. Never a capacity.Taught in CVT-104, CVT-114
Center bearing
The support between driveshaft pieces; verify its station for the ordered wheelbase.Taught in CVT-107
Certification49 CFR 567
A named manufacturer's legal declaration, on a permanent label affixed to a specific vehicle (by VIN), that the vehicle conforms to all applicable FMVSS at its stated ratings and vehicle type, as of its date of manufacture. An act and a document — not a description of how finished a truck looks. An incomplete vehicle is not certified; it carries an IVD (intent), not a certification label.Taught in CVT-102, CVT-103, CVT-104 +10 more
Certification label49 CFR Part 567
The manufacturer's affixed label carrying GVWR, GAWRs, vehicle type, VIN, date of manufacture, and the certification statement. Establishes ratings, not weights.Taught in CVT-101, CVT-102, CVT-103 +11 more
Certified scale ticket
Gross mass of vehicle and load at one moment on one scale; payload only after a same-scale tare comes off.Taught in CVT-102, CVT-103
CG heighth, vertical CG
The height of the truck's center of gravity above the ground: Σ(weight × height) ÷ Σweight, for one load state.Taught in CVT-109
Chamber typeType 24, Type 30
The chamber's nominal effective area in square inches; pushrod force is roughly air pressure times that area.Taught in CVT-108
Change control
The four stamps carried by every current legal or rating claim: effective date, retrieved date, reviewer, next review date. Three dates and the name of the person who verified it — the reviewer is not a date, and a record that quietly counts it as one is a record nobody can chase. Currency is relative to the question's own date anchor, not to the calendar.Taught in CVT-102, CVT-103, CVT-104 +10 more
Change propagation
Rerunning every line built on a value when it changes, not just its own line.Taught in CVT-110
Change-order markup
A builder’s written surcharge on a change, rising with the build stage.Taught in CVT-112
Charger service
The charger’s service provider or the site’s qualified electrical worker; owns cabinets, dispensers and cables.Taught in CVT-114
Chassis dry weight
The OEM's chassis weight report basis on this truck: oil and coolant in; no fuel, DEF, driver or body.Taught in CVT-104
Chassis OAL
Bumper face to end of frame: BFA + WB + AF. Body and rear devices come later (103.5).Taught in CVT-103
Chassis OAL · vehicle OAL
Bumper to frame end (BFA + WB + AF); bumper to the rearmost point of the truck with the gate stowed.Taught in CVT-103
Chassis-cabfederal definition
An incomplete vehicle with a completed occupant compartment.Taught in CVT-101
Claim
A number a party asserts on its own basis. FACT that it was claimed; never a rate or a property of this truck.Taught in CVT-111
Claim kind
One of nine; named before any grading.Taught in CVT-101
Claim rate
Usable energy divided by a brochure range: the rate the claim implies if every usable kWh went into its miles. It inherits the usable figure's state and is never a planning rate.Taught in CVT-111
Claim register
Spec Baseline™ entry 112.4: every load-bearing claim, bolted and dated, with its currency and what retires it.Taught in CVT-112
Class of change
Major if it touches limits, a baseline, an interface, logistic support, cost, price or delivery; minor if an administrative or documentation correction only (one defense tailoring).Taught in CVT-112
Clear back of cab
Nothing on the order stands between cab and body; effective CA equals CA. Confirm it on the as-ordered frame layout.Taught in CVT-103
Clear zone
The space ahead of the body rear a tuck-under gate needs free of frame and crossmembers to fold and stow.Taught in CVT-103
CLEAR, CLOSE, EXCEEDSFRM-001 screen words
The course's screen words are printed with the factor. CLEAR when the factored per-rail moment is at or under 85% of the RBM, CLOSE over 85% up to 100% inclusive, EXCEEDS over 100%. It is UNRESOLVED when an input is missing. A screen, never an approval.Taught in CVT-106
CLEAR, CLOSE, EXCEEDS, UNRESOLVEDFRM-001 screen words
The course's screen, not an industry standard; the maker's manual governs. A factored per-rail moment at or under 85% of the RBM is CLEAR, over 85% up to and including 100% is CLOSE, over 100% EXCEEDS. It is UNRESOLVED when a yield, SM, load or position is missing. Printed with its factor every time.Taught in CVT-106
Clears / Slim / Short
Margin ≥ 5% of the line / 0 to under 5% (exactly at the line is Slim) / below the line.Taught in CVT-113
Clears / Slim / Short / UNRESOLVED
The screen's four words against a named line. Under it by 5% of the line or more; under it by less than 5% (exactly at it counts as Slim); over it; or turning on a missing input, named.Taught in CVT-113
Clock
what a cost line grows with: miles, engine hours, loads, the calendar, or once.Taught in CVT-113
Clock (of a service item)
the use that brings it due: miles, engine hours, dumps or the calendar.Taught in CVT-113
Closed map
The Work-State Map™ with every entry assembled per state, each line in its evidence state, and every open line paired with its request. Closed means honest, not finished.Taught in CVT-110
Closure sketchReference Grid entry 103.8
The controlled sheet assembling entries 103.1–103.7: every dimension with two points, document, load state and evidence state; every conflict decided and owned; every open number requested.Taught in CVT-103
CMVCommercial motor vehicle · 49 CFR 390.5
A scope definition determining whether federal safety regulations apply to a vehicle and operation. Not a description of a vehicle. Different parts of the regulations draw the boundary differently.Taught in CVT-101, CVT-102, CVT-103 +11 more
CNG, LNG, RNG
Compressed or liquefied natural gas; RNG is renewable gas, a source, not an engine.Taught in CVT-111
Cold cranking amps
Current for 30 seconds at 0 °F holding at least 7.2 V. A starting rating, silent on hours.Taught in CVT-110
Cold factor
A multiplier on the mild rate for a temperature band that already holds cab and battery heat while driving. Add no heater kilowatts on top.Taught in CVT-111
Cold pressure
The inflation pressure, measured cold, at which a tire's load is stated.Taught in CVT-104
Combined CG
Σmoment ÷ Σweight: the one place the whole weight could hang and give the same two axle loads.Taught in CVT-104
Complete (of a log)
Every field holds a value with unit, basis, source and state, or an unresolved marker with a named request. Complete does not mean full.Taught in CVT-102, CVT-103
Completed vehicle49 CFR 567.3
A vehicle requiring no further manufacturing to perform its intended function. Only now does a certification label state it as certified.Taught in CVT-101, CVT-102, CVT-103 +11 more
Compliance date
The day the regulated party must meet the text.Taught in CVT-112
Compliance factor
The share of SSF a real truck reaches once tires, springs, lash and frame twist let it lean: planned at 0.60, 0.75 and 0.85, not measured bounds.Taught in CVT-109
Component envelope
All the space a component needs: its length on the rail plus heat, service, removal and motion clearances.Taught in CVT-103
Compression / spark ignition
Diesel lights fuel with compressed hot air (DPF, SCR, DEF). Gas, propane and gasoline use a spark and a three-way catalyst.Taught in CVT-111
Concurrency
The fleet's refill asked for at the same hour: energy, average power and peak, not one truck's rate.Taught in CVT-111, CVT-114
Concurrent load
A system that runs across several states, such as a refrigeration unit. Recorded as a channel spanning states, never as a state.Taught in CVT-102, CVT-103
Condition
What a weight includes: fuel and how much, other fluids, DEF, driver, body and equipment, carried gear, cargo.Taught in CVT-104, CVT-112
Conduit
Someone relaying a claim they do not hold. “They told me” marks one; trace the claim to its holder.Taught in CVT-102, CVT-103
Cone test
A site's tape values laid out in cones and driven at walking pace with a spotter. Field practice, not a standard.Taught in CVT-109
Configuration audit
A unit’s as-built list and its plates read against the baseline in force, each difference classed: documented, undocumented or clerical.Taught in CVT-112
Configuration row
The book row whose cab, steer position, exhaust, axle and tire labels match the order. The number is valid only inside it.Taught in CVT-103
Configuration-specific evidence
A document about this configuration, at this edition or date. Evidence about another model, class or year is not evidence about this frame.Taught in CVT-106
Conflict
Two items claiming the same inches of the same rail side and position, computed from stations on dated drawings.Taught in CVT-103
Conflict record
Disagreeing claims side by side, each with holder and source type, plus the governing source and why. Never an average.Taught in CVT-102, CVT-103
Conformance anchor
The label’s “in effect in” month and year, between the earlier-stage date and completion.Taught in CVT-101
Consecutive
With no axle skipped. A span that holds two axles holds every axle between them, so a skip is never a group.Taught in CVT-105
Consulted (C)
Must be asked before the A signs; the answer can change the decision. Each C owns at least one requirement line.Taught in CVT-112
CONTRADICTED
A responsive, in-scope record says otherwise.Taught in CVT-101
Controlling groupat a given load
The group with the most negative margin, or the least room when nothing is over. Picked by margin, never by the smallest figure.Taught in CVT-105
Converter dolly49 CFR 571.3
A trailer chassis with axle(s), a lower fifth-wheel half, and a drawbar — converts a semitrailer into a full trailer to build doubles.Taught in CVT-102, CVT-103, CVT-104 +10 more
Converter stall
Full throttle with the output held still, as against a dock bumper or with the wheels stuck and not turning; all the engine's power becomes heat in the oil.Taught in CVT-107
Cooling time constant
The time a drum takes to shed about 63% of its heat above ambient: about 15–35 min, from five-axle data.Taught in CVT-108
Copy-forward
Building a new order by copying last year’s without re-checking each line.Taught in CVT-114
Cost at the wall, six price cells, Payback Flip
Terms taught in CVT-114.8.Taught in CVT-113
Cost per ton
Equivalent annual cost divided by planned tons a year, always tagged with its payload; down days count as lost hauling.Taught in CVT-113
Countedlift axle
A lowered lift axle the State’s rule treats as an axle under the formula. The statute and regulation are silent; FHWA’s policy answer leaves the choice to each State.Taught in CVT-105
Counting rule
The written definition of what counts as a stop, declared before counting.Taught in CVT-102, CVT-103
CPU
Cost, Payload, Usage: the three families of customer questions, settled Usage first.Taught in CVT-114
Creep
Work while moving at a crawl held by a separate speed control, about 0.25–6 mph: sweeper, striper. Slow driving on the road throttle is not creep.Taught in CVT-110
Critical density
Available payload divided by usable internal volume: the density at which the body fills and the payload runs out together.Taught in CVT-101, CVT-102, CVT-103 +1 more
Critical failureRed Line — a gate, not a penalty
One of six coded errors (RL-01 to RL-06) that moves a submission to RETAKE REQUIRED regardless of its weighted score, because each produces a description that actively misleads: system blending, invented rating or approval, energy or finance strategy as the Mission Domain™, a boundary moved by rounding, an out-of-scope source used as applicable, and an unsupported legal or compliance claim.Taught in CVT-102, CVT-103, CVT-104 +10 more
Critical speed
The speed at which a tube whips; it falls with the square of length.Taught in CVT-107
Crossmember
A rung bolted between the rails' webs at a fixed position. Keeps the rails parallel and square and carries brackets.Taught in CVT-106
Cruise engine RPM
Engine speed at steady road speed in top gear: MPH × axle ratio × rev/mi ÷ 60 (direct top gear; multiply by the top-gear ratio for an overdrive). The number the whole powertrain-matching interface is arranged to control.Taught in CVT-102, CVT-103, CVT-104 +10 more
Cruise need
The speed the route's miles are driven at, stated by the people who run the route.Taught in CVT-107
Cruise rpm
Engine speed at a stated road speed in top gear, converter locked: mph × top gear × axle × rev/mi ÷ 60.Taught in CVT-101
Cruise-control maximumECM setting
The highest cruise set speed: at or just above the cruise need, below the limit.Taught in CVT-107
CTcab to the tandem's reference
Cab to the tandem's reference point — trunnion, tandem center or forward axle, depending on the document. No universal definition.Taught in CVT-103
Cube-out
Volume binds first: ρ × V below P.Taught in CVT-101
Cube-out and weigh-out
The box fills before the scale does, or the scale tops out with room left in the box.Taught in CVT-114
Cubes out / weighs out
On the whole-body screen, lighter-than-critical freight fills the body first (cubes out); heavier freight exhausts the payload first (weighs out). Compartment fit is separate.Taught in CVT-102, CVT-103
Curb weightfederal definition
Vehicle complete with standard equipment and full fluids, no driver or cargo. A published base-configuration figure — confirm this specific unit by weighing it.Taught in CVT-101, CVT-102, CVT-103 +11 more
Curb-to-curb radius
The outside front tire's turning radius, as a book's table prints it. Wall-to-wall is configuration-specific. Not R 0 .Taught in CVT-103, CVT-109
Currency
Current, review due, stale or superseded, counted in calendar days against the claim’s validity.Taught in CVT-112
Custodian
Who holds the record and can release it.Taught in CVT-101
Customer side, supply side
The account that decides every tag; the vendors and makers that execute its decisions.Taught in CVT-101
Customer-stated requirement
A need the account or its customers state, recorded with who said it, when, and a locator. Never rewritten as a rule.Taught in CVT-102, CVT-103
CVSS
A 0–10 severity score published with a vulnerability advisory; 9.0 and above rates critical.Taught in CVT-110
CWR, P-2, Q-1A, WS-B
The OEM chassis weight report; the body builder's weight and CG sheet; the revised chassis quote; the order worksheet's backup lines.Taught in CVT-104

D

Drear-axle datum
A distance ahead of the rear axle, used by some OEM books. Convert with x = WB − D.Taught in CVT-104
D&A certificateDelivery & Acceptance
The lessor’s form the lessee signs to accept a delivered truck. Signing it is DR-5.Taught in CVT-112
Date anchor
The edition whose applicability covers this vehicle.Taught in CVT-101
Dated history
A prior operation’s figures, kept dated, never the new cycle.Taught in CVT-101
Datum
The zero a dimension is measured from: horizontal (bumper or back of cab), vertical (ground or a frame face), axle reference, and load state.Taught in CVT-103, CVT-104
Day line
The health at which the worst day stops fitting: worst-day kWh ÷ spendable kWh when new.Taught in CVT-114
Day value
Revenue lost minus variable cost not spent on a down day, driver paid either way; the owner's own number.Taught in CVT-113, CVT-114
Day value line
An uptime gap priced with the buyer’s own cost of a lost truck-day, entered in the cost case.Taught in CVT-114
dB(A)
Sound level weighted to the ear. Every figure names its test: parked or moving, doors shut or open, at high idle or at cruise.Taught in CVT-109
DC fast charging
DC from a cabinet on the pad, commonly 50 to 350 kW; “Level 3” is shop talk.Taught in CVT-114
DC-DC converter
Steps the bus down to 12/24 V.Taught in CVT-114
Decision right
Written authority to sign a decision, traced to a dated document (here the PP revised 2025-07 and the DA memo revised 2026-01-12).Taught in CVT-112
Decision state
The readiness of a record against one named next review: ready for next review , hold: evidence required , or hold: contradiction . Recorded separately from the disposition of any individual claim, and never a statement that a vehicle is certified, approved or permitted.Taught in CVT-101, CVT-102, CVT-103 +11 more
Decision trail
The dated chain from the first document to the call and the next re-screen.Taught in CVT-111
Declared (registered) weight
Set by the registrant with the state; enforceable under its statute.Taught in CVT-101
Decompression
Expanding a customer's adjective into the measurable variables it stands in for, each with a unit, a basis and a source.Taught in CVT-102, CVT-103
DEF, DPF/SCR
Diesel exhaust fluid, and the diesel particulate filter and selective catalytic reduction aftertreatment it feeds. The DPF/SCR runs hot: the book (BB) asks nearby bodies to tolerate 750 °F.Taught in CVT-103
DEF, SCR, slip catalyst
Diesel exhaust fluid (32.5% urea by mass); the catalyst that uses it to turn NOx into nitrogen and water; the catalyst that cleans up leftover ammonia.Taught in CVT-111
Defective brake (counted)
For the 20% rule: 1/4 in or more past the limit is one; two under 1/4 in are one; at the limit, none.Taught in CVT-108
Delivered airscfm into the tank
The free air that actually reaches the reservoirs at working pressure. Modeled here as displacement × (rpm ÷ rated rpm) × 0.58.Taught in CVT-108
Delivered price
What the account pays to take the truck: quoted price plus every tax and charge the quote excludes.Taught in CVT-113
Demand charge
A bill line for the month's highest kW over the tariff's demand interval, in $ per kW-month.Taught in CVT-114
Demonstration agreement
The written terms meant to keep the pre-signature route day inspection; counsel reads them.Taught in CVT-112
Departure angle
Steepest slope behind the rear tires the truck meets before a low rear point touches; check every one and use the smallest atan(height ÷ distance behind the axle).Taught in CVT-103
Deratealso inducement
A torque or speed limit when DEF runs out or goes off-spec; its schedule depends on a dated guidance, rule text or proposal.Taught in CVT-111
Descent rpm
Engine speed on the grade: road speed × axle ratio × tire rev/mi ÷ 60 × the gear held.Taught in CVT-108
Design vehicle
A road template such as SU-30, for laying out streets; not a truck's capability.Taught in CVT-109
Deviation
Permission to depart from the baseline for named units, without changing it. A DR-4 decision.Taught in CVT-112
DGEdiesel gallon equivalent
Fuel carrying a diesel gallon's energy, 37.7 kWh at lower heating value: 6.384 lb of CNG, 1.52 gal of propane.Taught in CVT-111
DGE, LHV
Diesel gallon equivalent: fuel holding 37.7 kWh at the lower heating value, the basis for every cross-path comparison.Taught in CVT-111
Diesel gallon equivalent
The amount of another fuel holding one gallon of diesel's energy: 6.37 lb of compressed natural gas (the lab table's LHV basis), or 1.11–1.15 gal of gasoline.Taught in CVT-107
Direct drive / overdrive
A top gear of 1.00, or below 1.00.Taught in CVT-107
Direct vision
What the driver sees through glass from the seat, with no mirror or screen.Taught in CVT-109
Discount rate
the price of waiting; the owner's rate for turning future dollars into today's.Taught in CVT-113
Displacementwhat a sheet’s cfm usually means
The free air a compressor's piston sweeps in a minute at a stated speed: a size, not the air that reaches the tank. A cfm on a quote must say whether it is this.Taught in CVT-108, CVT-110
Disposition
The controlled result of an evidence assessment: confirmed , provisionally supported , contradicted , or unresolved . "Legal" and "compliant" are prohibited unless the specified controlling evidence is present.Taught in CVT-101, CVT-102, CVT-103 +11 more
Divisible load
A load that can be split into smaller loads without losing its use or value or taking more than 8 workhours. Crushed stone is one.Taught in CVT-105
Division (d)
The scale's smallest step, 20 lb here.Taught in CVT-104
DM1 / DM2
The J1939 diagnostic messages for active and previously active fault codes. They report failures, never settings.Taught in CVT-110
DO NOT RELEASE
DO NOT RELEASE: CERTIFICATION RESPONSIBILITY/EVIDENCE UNRESOLVED: a stage, a signer or its document is unnamed.Taught in CVT-106
DO NOT RELEASE: SERVICE/WARRANTY SUPPORT UNRESOLVED
The registry's red line (SE-088, SE-090): the screen doesn't call support ready on that path until the named document is in hand.Taught in CVT-113
Dominant work process
The work a vehicle performs during most of the time it is generating revenue or delivering the service it was bought for. Measured in working time and revenue — not in capability, not in the most expensive option on the spec, and not in what is most visible. The single field that determines market placement.Taught in CVT-101, CVT-102, CVT-103 +11 more
Down-rating / up-rating
Assigning a lower or higher GVWR. Down-rating is a manufacturer certification choice below the hardware's capacity; up-rating requires re-certification against adequate components, by the manufacturer or an alterer under 49 CFR 567.7.Taught in CVT-102, CVT-103, CVT-104 +10 more
Downspeeding
Gearing for lower engine rpm at a given road speed; it raises torque for the same power. The line-haul fuel rule cannot establish a city-truck saving.Taught in CVT-107
DPFdiesel particulate filter
Traps soot and ash; regeneration burns the soot, cleaning removes the ash.Taught in CVT-111
DR-1 to DR-6
The account’s six buyer decisions: baseline for RFQ, RFQ issue, award, deviation or change, acceptance (D&A), release to routes.Taught in CVT-112
Draw-Down Librarymaster tool
Graded planning ranges for every way a truck spends its battery.Taught in CVT-114
Drive axle ratio
Driveshaft turns per wheel turn. Numerically higher is deeper (“shorter”); “faster” is numerically lower.Taught in CVT-101
Drive cycle
The speed-versus-time profile of the vehicle in motion . A component of the duty cycle, never a synonym for it — it is blind to every state where road speed is zero.Taught in CVT-101, CVT-102, CVT-103 +11 more
Drive-axle retarding
Slowing through the driveline (exhaust brake, output retarder, motor in regen); it reaches the road through the drive axle alone.Taught in CVT-108
Drive-axle share
The fraction of weight on the driven axle; on this case truck it is lower empty; where the cargo sits decides it.Taught in CVT-107
Driveshaft revolutions per mile
Axle ratio times tire rev/mi: sets road speed per rpm in each gear, and launch pull per lb-ft.Taught in CVT-107
Drops out
equal under both options: zero in the gap, still in cost per ton.Taught in CVT-113
Drops out of the difference
A cost equal under both options: it leaves the gap alone and stays in cost per ton. Per ton, it cancels only at equal tons.Taught in CVT-113
Dry weight
A chassis report’s basis: no fuel, DEF, driver or body.Taught in CVT-101
Dual matching
Paired tires within ¼ in of diameter and 4/32 in of tread, at one pressure.Taught in CVT-109
Dual-circuit air
Two service circuits, primary and secondary, each with its own reservoir and brakes, to preserve braking for specified isolated failures.Taught in CVT-108
Dump switch
Exhausts the air springs to lower the frame; one option in the bulletin works at 5 mph or less, another to a programmed speed. Read this chassis's settings. Never a clearance plan.Taught in CVT-109
Duty
The share of a state's hours a load runs. Rarely printed; usually said; the number that sets the average.Taught in CVT-110
Duty band
an engine maker's duty category, mostly set by overall mpg including idle.Taught in CVT-113
Duty cycle
Every working hour in one named state, on one denominator.Taught in CVT-101, CVT-108
Duty limit, site rating
A maker's limit on use (one highway air tandem: 25% off-highway), and a higher rating valid only at 5 mph or less for a small share of operation. Neither is the road rating.Taught in CVT-109
Duty rowregional, mixed, urban
Which all-in percent a lane uses: a written claim.Taught in CVT-114
Duty-cycle confirmation
The operation's signed statement of lanes, loads, payload rule and mission, and what changed since the last order.Taught in CVT-113
Duty-cycle fact
The route property that makes two trucks' entries differ: launches per mile, highway share, mass, grade, surface.Taught in CVT-107
DVIR
the driver vehicle inspection report under the federal maintenance rule, kept three months.Taught in CVT-113
Dwell
Inside the window, engine off, no other state true — the residual engine-off state, as idle is the residual engine-on one. Unlike the stop dwell of Lesson 102.4, which is time at the stops, it is the state most often missing from a short day.Taught in CVT-102, CVT-103, CVT-113

E

E-axle
An axle with its own motor, inverter and gearbox; a tandem may drive one or two.Taught in CVT-114
EAC (equivalent annual cost)
NPV spread into equal yearly amounts; compares different horizons when each cycle repeats with a like truck.Taught in CVT-113
eCFR banner date
The “up to date as of” date on the unofficial compilation.Taught in CVT-112
ECM
Engine control module: holds governed rpm, road-speed limit, axle ratio and tire rev/mi.Taught in CVT-101
ECM parameter sheet
What the engine control module was programmed with: tire rev/mi, axle ratio, limit, cruise maximum.Taught in CVT-107
Economic life
The replacement age where owning cost per year is lowest; the flat bottom is the window of ages near it.Taught in CVT-113
Edge distance
How close a web hole may come to a flange, measured to the hole's edge or centerline as the manual says. BBM-H: 2 in to the hole's edge.Taught in CVT-106
Effective CA
The CA an OEM prints for a stated back-of-cab package. Read from the row; never carried across books.Taught in CVT-103
Effective date
The day a text's current wording took force. Not a print date, not a read date.Taught in CVT-105, CVT-112
EGR, DOC
Exhaust gas recirculation (cooled exhaust back to the intake, less NOx); diesel oxidation catalyst (burns CO and hydrocarbons, makes NO2).Taught in CVT-111
Electric standby
The refrigeration unit run by its electric motor from a receptacle, engine off.Taught in CVT-111
Emergency braking
Stopping with one service circuit failed. Table II's emergency column (613 ft from 60 mph for single-unit trucks) tests it.Taught in CVT-108
Emergency lowering
Bringing the platform down on the 12 V pump from the starting bank when the engine is off: short bursts, about 9.0 Ah.Taught in CVT-110
Emergency stop
A control at every station that stops hydraulic motion and cancels work speed. On this aerial it does not stop the engine.Taught in CVT-110
End flagcourse flag
FRM-001 stage 3's mark on any end (insert, sill or fishplate) where the single rail would work over 70% on the screen. Not a fatigue limit; the two-rail-height clearance is a separate flag.Taught in CVT-106
Endorsement
An addition to a CDL granting authority for specific cargo or vehicle types — H, N, X, P, S, T. Endorsements add privilege.Taught in CVT-102, CVT-103, CVT-104 +10 more
Endurance threshold
The stress swing below which plain rail steel can last indefinitely: about 40–60 ksi in one line of published guidance. Not a value for holes or welds.Taught in CVT-106
Energizationthe power date
The day the utility connects added capacity, after application, load study, design and make-ready.Taught in CVT-111, CVT-114
Energyhp·h, kWh, Btu, gal
Work done over time. One gallon of diesel holds 128,488 Btu (37.66 kWh) on a lower-heating-value basis.Taught in CVT-107
Energy flow
Where each state's energy comes from and where it goes, from fuel to the boom, tools and lights.Taught in CVT-110
Energy path
What a truck carries, what converts it into motion and work, and what refills it.Taught in CVT-111
Energy Path Map™module signature record
The propulsion feasibility and infrastructure evidence screen: every candidate path for one mission, storage to depot, each value with its state.Taught in CVT-111
Energy-dependent option
A vehicle option that works only if the site supplies it. Committed only after the supply is evidenced (SE-112).Taught in CVT-102, CVT-103
Enforcement tolerance
A discretionary margin some jurisdictions apply before citing an overweight. Varies by jurisdiction, is not a right, and never raises the legal limit.Taught in CVT-102, CVT-103, CVT-104 +10 more
Engine hours
Run time on the meter; not miles, not wear.Taught in CVT-101
Engine service class
The class (light, medium or heavy heavy-duty) on an engine's certificate; it, not the truck's weight class, sets the floor.Taught in CVT-113
Engine sweet spoteconomy band
The RPM range where an engine makes torque efficiently — the place you want cruise to land. The real band is read from the engine's own torque and fuel curve.Taught in CVT-102, CVT-103, CVT-104 +10 more
Engine-computer tire parameter
The programmed rev/mi and axle ratio behind the limit, cruise, odometer and fuel reports.Taught in CVT-107
Engine-driven / turbine-driven gear
What turns an automatic's PTO drive gear: the engine (speed follows engine rpm in any range) or the torque-converter turbine (speed changes with shifts).Taught in CVT-110
Engine-off on site / Parked
Key on with the engine off, running loads from the batteries; and key off at the yard, parasitic draws only.Taught in CVT-110
Entry
What one lesson adds to the record, named by its lesson code: entry 101.1 to entry 101.8.Taught in CVT-101
Entry EEnvironment & support
The E of ROLE: environment, site infrastructure, depot energy and support, each line with a record type, evidence state and owner.Taught in CVT-102, CVT-103
Entry rule
A claim enters in the state its sources can carry. An owner's dated, written decision is a fact about it. A said-only quantity is a bounded assumption or unresolved. One logged or seen source is a fact for its scope. A costly-to-reverse need waits for a second, independent source.Taught in CVT-102, CVT-103
ePTO
An electric motor, fed from a high- or low-voltage battery source, that drives the body’s pump.Taught in CVT-101, CVT-114
Equivalent annual cost (EAC)
The level yearly cost with the same present value as the real stream of costs.Taught in CVT-113
Equivalent wheelbase
The longer wheelbase a fixed tandem turns on: about 4–6% past the tandem center.Taught in CVT-109
ESC / roll-only control
Electronic stability control corrects roll and yaw; roll stability control brakes on lateral acceleration only.Taught in CVT-109
EV Fit Score™
Six weighted factors scored 0 to 100 as a floor and a ceiling, banded GO, PROVE IT or NOT YET.Taught in CVT-114
Event question
A question anchored to a named day, stop or load that asks what happened, how much, and how the speaker knows.Taught in CVT-102, CVT-103
Evidence class
The kind of record that can issue or observe a given answer: governing rule, certification record, manufacturer record, measurement, operational record, representation. Matched before authority is ranked. Outside its own class a source is not weak — it is nonresponsive to that claim.Taught in CVT-101, CVT-102, CVT-103 +11 more
Evidence gradeA to D
A: measured, primary or peer-reviewed. B: a reputable secondary report or a model, even a peer-reviewed one. C: the seller’s own claim, or a builder’s estimate of what it has not measured. D: an anecdote. It grades the measuring, not the truck.Taught in CVT-114
Evidence ledger
A single auditable table holding every claim with its source, exact locator, evidence state and applicability note. Replaces evidence scattered through prose, and is what makes a request writable.Taught in CVT-102, CVT-103, CVT-104 +10 more
Evidence Locksix bolts
A number written with its claim ID, value and unit, scope, source with exact locator, date and evidence state.Taught in CVT-112
Evidence request
A structured work product naming the claim under test, the governing question, the jurisdiction and scope, the evidence object, the exact locator required, who holds it, what each possible answer settles, and the decision it unblocks.Taught in CVT-102, CVT-103, CVT-104 +10 more
Evidence state
The status the course assigns to any claim — one of four: fact , inference , assumption , or unresolved . A fact can be visible (you can see it) or sourced (a document proves it). Every number used in this course carries one.Taught in CVT-101, CVT-102, CVT-103 +11 more
Evidence-entry rule
The owner's dated, written decision is a fact about that decision; a said-only quantity is a bounded assumption or unresolved (Section 4).Taught in CVT-102, CVT-103
Exact halfa tie
A raw W ending in 250 or 750; FHWA’s table rounds it down.Taught in CVT-105
Exact locator
Section, paragraph, page, line, edition, effective date and retrieved date — enough that a reader lands on the same words and a later change is visible. A URL alone is not a locator.Taught in CVT-102, CVT-103, CVT-104 +10 more
Exhaust brake
A retarder that chokes the engine's exhaust; its power rises and falls with engine rpm.Taught in CVT-108

F

Fact
A value a document or measurement states, for a stated scope. Carries its locator, date and scope.Taught in CVT-102, CVT-103
Failed scope
Right class, wrong VIN, configuration or date.Taught in CVT-101
Fails / Meets as stated / Unresolved
The offer contradicts the line / its document claims enough, nothing verified / silent or a different condition.Taught in CVT-112
Failure ladder
The order in which falling air takes the accessories, warning, hold-off and park valve.Taught in CVT-108
False pass
Releasing a decision on a value the record cannot support.Taught in CVT-102, CVT-103
Fast fill
CNG from a station’s high-pressure storage in minutes; a hot fast fill leaves the cylinders short of the label.Taught in CVT-111
Fatigue
Cracking from repeated stress swings, each below the steel's yield. The way frames fail.Taught in CVT-106
Federal ceilingof a geometry
The highest gross every axle group of a truck can carry under the federal Interstate figures. Computed in 105.5; for a short truck it sits below 80,000.Taught in CVT-105
Federal figurethe law's number
20,000 lb single axle, 34,000 lb tandem, 80,000 lb gross unless the bridge formula gives less, under the federal statute and regulation. Holds on the Interstate System and reasonable access; inclusive of all tolerances. A State holding grandfather rights may allow more there (105.7).Taught in CVT-105
Federal Interstate figureL rail
The federal Interstate weight rule: 20,000 lb on any one axle, on the Interstate System and reasonable access. Quoted, never concluded; routes belong to CVT-105.Taught in CVT-104
Feed, Fit, Fence, File
The four site questions: what supplies the path, what space and positions it needs, what protects people and property, and who must approve it in writing.Taught in CVT-111
FET
The federal retail excise tax on heavy truck chassis and bodies: 12 percent by the text of the federal excise statute; the dealer's itemized computation shows the base.Taught in CVT-113
FHWA classification
A 13-category scheme sorting vehicles by observed configuration — units, axles, combination status. Carries no rating information and changes when a trailer changes.Taught in CVT-102, CVT-103, CVT-104 +10 more
FHWA vehicle category
One of 13 roadside-count bins: bus or truck, tires, axles on the road, units.Taught in CVT-101
Field of view
The area a camera shows on its screen, stated by its maker as angles or a ground footprint.Taught in CVT-109
Final, proposed, interpretive
A final rule binds whom it names; a proposed rule changes nothing until final; an interpretive rule states how an agency reads its own authority.Taught in CVT-111
Final-stage manufacturer
The party whose work completes the vehicle; by default it certifies it.Taught in CVT-101, CVT-106, CVT-112
Firming up
Re-tagging a line to a stronger state without a new document; never allowed.Taught in CVT-113
First article, lot acceptance
The first truck gets every test; each later unit is checked for being that truck.Taught in CVT-112
First limit
The limit (months, miles or hours) a truck reaches first at its owner's use; the warranty line ends there.Taught in CVT-113
First purchase
The first purchase of a vehicle other than for resale; the alterer role ends there.Taught in CVT-101
First retail sale
Before it, the final stage or an alterer may set a rating; after it, the label's rating stays.Taught in CVT-106
Fishplate
A reinforcement plate bolted to the outside of the web over a short run, tapered at both ends; not the 106.5 rear fishplate bracket, a stop.Taught in CVT-106
Fit margin
Available payload less the departure load: 708 lb on the new trucks, an ASSUMPTION (CVT-104 modeled tare); unit 1 as built runs about 620.Taught in CVT-111
Fixed cost
a line that runs on the calendar or the truck's age and doesn't shrink when the work does.Taught in CVT-113
Flange
The rail's short horizontal faces, top and bottom. They carry the bending: squeezed and stretched as the frame sags or hogs. Holes in them are ordinarily restricted; the manual governs.Taught in CVT-106
Fleet reserve
Energy your fleet refuses to spend: here, 10% of what is usable at the time. Breaking it is a dispatch failure, not an empty pack.Taught in CVT-114
Flip
How far one open line must move to change a screen word (Clears, Slim, Short) or the order between options.Taught in CVT-113
Flip friction
Pull ÷ axle load: the friction at which a pull uses all the grip.Taught in CVT-108
Flip point
the input value where an answer changes sign or screen word.Taught in CVT-113, CVT-114
Flip price
The input value at which cost per ton meets the line; here, the diesel price where cost per ton meets the haul rate.Taught in CVT-113, CVT-114
Flip value
The value at which a line’s verdict would change, and which way.Taught in CVT-108, CVT-109
Floorcleared funds
The points the evidence has earned. An Unresolved factor adds nothing.Taught in CVT-114
Floor energy
What the pack can spend at the 80% health floor after the reserve: 576 kWh here.Taught in CVT-114
FMVSS49 CFR 571.3
Federal Motor Vehicle Safety Standards. Defines vehicle type by design purpose, fixed at build and certification.Taught in CVT-102, CVT-103, CVT-104 +10 more
Forecast ladderrungs 1 to 4
Reading, band, promise, cause. A forecast in a file stays at band or below; bring the others down. A point is a band that lost its width. Not the Product Constitution’s claims ladder (L0 to L4), which governs product claims.Taught in CVT-114
Forecast sentenceband, driver, trigger, review date
How the course states the future: a range, what moves it, what reopens it early, and when to look again.Taught in CVT-114
Form / status
What a truck is, read by looking; where it stands in the build-and-certify chain, evidenced by documents.Taught in CVT-101
Formula Bbridge gross weight formula
W = 500[LN/(N−1) + 12N + 36]: the federal figure for any group of two or more consecutive axles on the Interstate and reasonable access.Taught in CVT-105
Four pipes
Truck acceptance, charger, cable and connector, site share. The narrowest sets the time.Taught in CVT-114
Frame data sheet
The chassis maker's document for one configuration's frame. FACT about the sheet; INFERENCE about trucks not yet built.Taught in CVT-106
Frame layout
The OEM's drawing of the components on the rails for one configuration and order. Not exhaustive: other components may be placed on the rail.Taught in CVT-103
Frame rail
One of the two lengthwise beams of a ladder frame: a web with a flange at its top and bottom edges.Taught in CVT-106
Frame twist
The frame winding up along its length when one wheel drops or rises. Open-channel ladder frames are built to allow it.Taught in CVT-106
Frame-end window
Where a rear device's install guide wants the frame to end, measured from the body rear (gates) or as AF (hoist).Taught in CVT-103
Free airft³ and scfm
Air counted at atmospheric pressure: in³ × psi rise ÷ 14.7 ÷ 1,728 gives ft³.Taught in CVT-108
Friction coefficient (μ)
How much of the load on a tire it can push with before it slips. Snow, ice and gravel values are proxies, mostly car tires.Taught in CVT-107
Friendly-end test
Re-running a screen-out with every input at the end of its range that favors the path.Taught in CVT-111
Front share
Front-axle load as a percent of gross. It can rise while the load falls; never read it as the load.Taught in CVT-104
Front swing
Wall to wall minus curb to curb: about 2.4 ft on this conventional.Taught in CVT-109
Fuel power
Fuel burned per hour times its energy content: gal/h × about 37.7 kWh/gal (lower heating value) gives kW.Taught in CVT-110
Fuel-card quotient
Odometer miles divided by the gallons on the card for one truck and period, off-card fuel reconciled; FACT-derived about that truck.Taught in CVT-113
Full-service lease
The lessor holds title, writes the order to the lessee’s needs and maintains the truck.Taught in CVT-101, CVT-113

G

Gap against doubt
The test between a hold and a screen-out: a band that straddles the line, or a load-bearing value with no band yet (UNRESOLVED), is a question. A band that misses everywhere is a blocker.Taught in CVT-111
Gate
The dated document that closes a stage: a signature or a manufacturer’s issue, after which a change costs more than it did the day before.Taught in CVT-112
Gate Zero
The check that runs before any arithmetic: is every required input present, applicable to this vehicle, and expressed with a usable unit and reference? A failure returns UNRESOLVED: EVIDENCE REQUIRED , naming the missing input and the decision it blocks.Taught in CVT-101, CVT-102, CVT-103 +11 more
GAWRGross Axle Weight Rating
The certified maximum for a single axle. Front and rear carry separate ratings, and both can be exceeded while gross weight remains legal.Taught in CVT-101, CVT-102, CVT-103 +11 more
GCWRGross Combination Weight Rating
The certified maximum for a power unit and its towed unit(s) together. The governing number for CDL Group A, which the power unit's own rating cannot answer.Taught in CVT-101, CVT-102, CVT-103 +11 more
Gear train
Top gear × axle ratio × tire rev/mi: the engine revolutions per mile. The tire is the last gear.Taught in CVT-107
Gear-down protectionECM setting
A lower limit in the one or two gears below top, so drivers upshift.Taught in CVT-107
Geared margin
Geared top speed minus the limit. No minimum in the sources reviewed; the course flags under 5 mph.Taught in CVT-107
Geared top speed
Road speed at the governed rpm in top gear on new-tire rev/mi. A powered ceiling, not an operating speed.Taught in CVT-101, CVT-107
General maximum
A broad height, width or length limit, such as most states' 13 ft 6 in to 14 ft. It describes no structure, door or bay.Taught in CVT-103
Governed rpm
Where the controller cuts fuel; downhill, the road can still push the engine past it.Taught in CVT-101, CVT-107
Governed speed
The maximum road speed the vehicle is set and allowed to run (often an ECM road-speed limiter), as distinct from a design or top speed. Gear for this, not the brochure number.Taught in CVT-102, CVT-103, CVT-104 +10 more
Governing link · next link
The lowest-rated link (where two tie, write both), and the one just above it, which sets what an upgrade can buy.Taught in CVT-104
Governing peak
The larger of a state's peak sag and peak hog, reported with its position as x from the steer-axle centerline.Taught in CVT-106
Governing question
The single question a claim is actually making, which determines which system and which source has authority over it. Named at step 2 of the conflict pattern, before any source is evaluated.Taught in CVT-102, CVT-103, CVT-104 +10 more
Governing source
The source with authority over a particular question: logged for frequency and duration, seen for physical practice, said from the holder for intent, promises and plans.Taught in CVT-102, CVT-103
Governing state
The load state with the lowest threshold, the one the screen carries. Set by height, not by weight.Taught in CVT-109
Governorcut-in, cut-out
Loads the compressor at cut-in and unloads it at cut-out: 110 and 130 psi on BA-1.Taught in CVT-108
Governor cut-out, cut-in
The pressures at which the compressor stops building air and starts again: 125 and 105 psi on Q-1.Taught in CVT-110
Grade
Rise over run, in percent, measured over the parking footprint; a two-fix GPS grade is a long-run estimate.Taught in CVT-108
Grade test
FMVSS 121's parking test: 20%, both directions, GVWR and unloaded plus 1,500 lb, smooth dry concrete.Taught in CVT-108
Grade transfer
Load the slope moves to the downhill axle: F · h ÷ WB. Facing down, it leaves the braked rear.Taught in CVT-108
Gradeability
The ability to sustain speed up a grade without the engine dropping out of its band. Set by the whole powertrain-matching chain against weight and grade.Taught in CVT-101, CVT-102, CVT-103 +11 more
Grandfather right
A State limit protected because it stood on July 1, 1956 (axle and gross) or January 4, 1975 (group tables). The State's to cite, never a truck's to claim.Taught in CVT-105
Gripμ × axle load
The most an axle's tires can push against the road in that load state on that surface (model value).Taught in CVT-108
Grip needed
Hold force over the normal load on the braked tires: the friction the surface must supply.Taught in CVT-108
Gross / net rating
Ratings tested in different configurations, with different accessories fitted. Which one a sheet uses, and what it leaves out, is its own footnote.Taught in CVT-107
Gross ton-miles per gallon
mpg × gross weight ÷ 2,000: work per gallon, still specific to one route.Taught in CVT-107
Groupfederal CDL rule
A, B or C: the vehicle test a CDL is issued for. The state issues the license.Taught in CVT-101, CVT-105
Group B
The federal license group for a single vehicle with a GVWR of 26,001 lb or more. The CDL rule's CMV definition also counts actual GVW. Set by weight, not brake type.Taught in CVT-108
Group count
n(n−1)/2 groups for n axles: 1, 3, 6, 10, 15 for two to six axles. The single-axle checks are counted separately, one per axle.Taught in CVT-105
Group tableentry 105.4
Every group and axle with its load, the load's source and state, and its federal figure, both ways in the rounding band. It records; it does not pick a winner.Taught in CVT-105
GTWGross Trailer Weight · In-service rail
Actual weight of the trailer and its load. The rated trailer capacity is a separate Rated-rail number.Taught in CVT-102, CVT-103, CVT-104 +10 more
GVW
What the vehicle actually weighs, on a scale, on a day.Taught in CVT-101
GVW / GCWGross Vehicle / Combination Weight · In-service rail
What the vehicle — or the vehicle plus its towed units — actually weighs right now. Established only by weighing. One letter from GVWR/GCWR, opposite rail.Taught in CVT-102, CVT-103, CVT-104 +10 more
GVWRGross Vehicle Weight Rating
The manufacturer's certified maximum for the complete loaded vehicle. A ceiling assigned at certification, not a measurement. Sorts vehicles into Classes 1–8.Taught in CVT-101, CVT-102, CVT-103 +11 more

H

Hammer price
The winning auction bid, before the buyer's premium (the buyer's cost, on top) and before the seller's fees.Taught in CVT-113
Hand sectionsquare-corner check
I and S from nominal dimensions with square corners: usually a few percent above the maker's published value, which is the rating. A check only.Taught in CVT-106
Hard stop
A known Fails on Spend or Plug. It sends the file to NOT YET whatever the ceiling says. A Fails on any other factor blocks GO without stopping the file.Taught in CVT-114
Haul rate
What the account is paid per ton; here $10.50 on 16–20 mile lanes (PS-1).Taught in CVT-113
Headroom
GVWR minus the ready-to-load weight. Room under one ceiling; never a payload.Taught in CVT-104
Health floorwarranty health threshold
The health below which a maker acts, inside the term: a claim trigger, not the end of cover.Taught in CVT-114
Heat pump, PTC heater
A heat pump moves heat in from outside; a PTC heater makes it from current.Taught in CVT-114
Heat-affected zone
Steel the heat of a cut or weld has changed; one cited cut-off passage describes about 1–2 in of affected material without requiring its removal.Taught in CVT-106
Heat-treated rail
A rail quenched and tempered to its yield (FD-Q: 120,000 psi). No weld, heat or torch-cut hole.Taught in CVT-106
Heelplanning share
The course planning heel below the guide’s 250 psi gauge zero, about 6% of a full CNG fill; the actual delivery cutoff needs the maker’s specification.Taught in CVT-111
Height-control valveleveling valve
Adds or exhausts air to hold ride height. Dual valves also correct a lean. Neither balances side-to-side load.Taught in CVT-109
High-profile cab-over (COE)
In the step rule's definition, a cab-over whose door sill step sits above the height of the front tires.Taught in CVT-109
Highway / rugged-duty model
Model series, each with its own application list and rating table.Taught in CVT-107
Hill speed
The highest steady speed on a stated grade at full power in the best gear; here the 6% hill at 33,500 lb.Taught in CVT-107
Hinge bracket
The bracket the dump body pivots on, bolted to the web. When the body tips, it becomes one of the two supports of the lift.Taught in CVT-106
Holdrelease decision
A release stopped because a claim is open and named evidence would close it. Never a status or a verdict.Taught in CVT-101, CVT-104, CVT-105 +1 more
Hold force
The pull down the slope a parked truck must resist: W · sinθ.Taught in CVT-108
Hold time
How long a closed box keeps its set points with the unit off, for that unit and body; the unit maker’s number.Taught in CVT-111
Hold-off pressure
The air pressure that keeps the spring brakes fully released; below it they drag.Taught in CVT-108
HOLD: CONTRADICTION
Two documents, or two lines of one, disagree on something that decides the work.Taught in CVT-106
HOLD: CONTRADICTION, HOLD: EVIDENCE REQUIREDlocked strings
Two documents disagree (BQ-Q against BBM-H); or the one on file is the wrong one (a 2019 edition).Taught in CVT-106
HOLD: EVIDENCE REQUIRED
The deciding document is missing or is the wrong one, such as an edition that does not cover the truck.Taught in CVT-106
Holder
The person, record or observer with first-hand evidence for a claim.Taught in CVT-102, CVT-103
Holding valve
A valve that keeps a cylinder where it is when pressure is lost, so the boom holds instead of falling.Taught in CVT-110
Holds the pen
Writes or issues a document. Separate from owning the decision in it: the buyer owns the requirements at every stage.Taught in CVT-112
Honest ledger
DC-1’s worst day with every line counted, the yard-stop key-on included.Taught in CVT-114
Horizon
the years the screen counts, set by how long this owner keeps the truck.Taught in CVT-113
Hot-shift
A PTO with its own wet clutch, engaged while turning, below 1,000 engine rpm; on this transmission it needs the PTO enable circuit.Taught in CVT-110
House bank
Deep-cycle batteries for body loads, isolated from the starting bank behind a low-voltage disconnect.Taught in CVT-110
House bank, isolator, LVD
Deep-cycle batteries for body loads only; the device that keeps those loads off the starting bank; the low-voltage disconnect that drops them before over-discharge.Taught in CVT-110
HV bus
The high-voltage DC line from the gate to every load.Taught in CVT-114
HV junction box
Fuses and distributes the bus to the taps.Taught in CVT-114
HVIL
Interlock loop through the HV connectors; breaking it opens the contactors. Never a lockout.Taught in CVT-114
HVUT
The federal heavy vehicle use tax FACT . FACT You can point to the record: the source states it as written. Rule 26 U.S.C. 4481 Read 2026-06-08 CloseTaught in CVT-113

I

Isecond moment of area, in⁴
How far a section's material sits from the neutral axis. With the material's E it sets stiffness: how far the rail bends.Taught in CVT-106
I/O sheet
The signed list of every input and output: pin, signal type, location, logic, owner. If it isn't on the sheet, it isn't on the truck.Taught in CVT-110
Ideal front share
The front axle's share of the load at a given deceleration.Taught in CVT-108
Identity and operation gate
Same VIN? Same work? Answered before any value moves.Taught in CVT-101
Identity closure
Checking BBC = BFA + AC, WB = AC + CA and chassis OAL = BFA + WB + AF across documents. A closure shows the numbers are consistent, not that the end points match; a miss means a convention, row or typo problem to ask about.Taught in CVT-103
Impact protection
Posts or approved barriers that keep vehicles off equipment such as chargers, dispensers and gas equipment.Taught in CVT-111
Implied mpg (of a surcharge table)
The step in cents a gallon divided by the payment in cents a mile.Taught in CVT-113
Inboard / outboard
Between the frame rails, or hung outside them. Equal stations on one rail are a potential conflict until heights and sections are known.Taught in CVT-103
Incomplete vehicle49 CFR 567.3
A chassis requiring further manufacturing to become a complete vehicle. Passes through intermediate and final-stage manufacturers, each with allocated certification responsibility.Taught in CVT-101, CVT-102, CVT-103 +11 more
Incomplete Vehicle Document49 CFR 568.4
Furnished with an incomplete vehicle: intended GVWR/GAWRs, suitable vehicle types, and conformity statements, accurate as of its date. States intent and boundaries — not a completed-vehicle certification.Taught in CVT-102, CVT-103, CVT-104 +10 more
Incomplete vehicle manufacturer
The party that assembles the incomplete vehicle and furnishes the IVD; here, the chassis maker.Taught in CVT-101
Incomplete, completedstates, federal definition
Incomplete: still needs manufacturing to do its job. Completed: needs none. States, never roles.Taught in CVT-106
Independent sources
Two sources neither of which could have been produced from the other.Taught in CVT-102, CVT-103
Inference
A value reasoned beyond what its inputs state: a generalization, a typical-day claim, a model. Carries its reasoning. Arithmetic inherits its weakest input's state instead; a said-only quantity is never an inference.Taught in CVT-102, CVT-103
Informed (I)
Told after the decision; no say in it. New evidence goes to the A as a change.Taught in CVT-112
Inheritance rule
A derived value takes the evidence state of its weakest input. Clean arithmetic on an assumed input yields an assumption with decimal places, not a fact.Taught in CVT-102, CVT-103, CVT-104 +10 more
Inner bridge
Any group shorter than the whole truck. Unit 31 has five; a five-axle combination has nine. Never just “the drive tandem.”Taught in CVT-105
Inner insert
A channel nested inside the rail, adding section and stiffness only between its own two ends.Taught in CVT-106
Inner insert, outsert
A second channel nested inside the rail (insert, or liner) or wrapped outside it (outsert). Adds section only where it runs.Taught in CVT-106
Input / answer
what goes into a model (a price, a payload, a rate) and what it computes (an NPV, a cost per ton, a gap).Taught in CVT-113
Inside path
The path of the inner face of the inside rear dual at full lock.Taught in CVT-109
Inspection point
A place a technician must see or reach: chamber marks, pushrod, drains, lamps.Taught in CVT-108
Installed front sharebrake balance
The front brakes' share of the braking torque, fixed by the hardware: 44.4% on BA-1 (model).Taught in CVT-108
Interface
The point where one system's output must match another system's input, limit, or expectation. An interface has no spec sheet of its own; it is a check you perform across systems, and it is where most specification failures live.Taught in CVT-101, CVT-102, CVT-103 +11 more
Interface concept
AQ-1 with the insert kept and BQ-Q's listed revisions: what READY FOR NEXT REVIEW covers on June 18, before any revised drawing exists.Taught in CVT-106
Interface Record™
The body/chassis interface control record this module builds, eight entries. Entry 106.1 is frame identity.Taught in CVT-106
Interface Record™ entry 106.4
The load path: every state per rail at the stated factor, both quotes, insert kept and deleted, and the open decision with its document.Taught in CVT-106
Interface Record™ entry 106.8
The release review: fifteen lines, unit 31's evidence apart, and the recommendation.Taught in CVT-106
Interface release review
Every chassis-to-body line read with its state, its string and the document that would close it.Taught in CVT-106
Interlock
A condition that must be true before a function runs. It stops a function; it is not a lockout.Taught in CVT-110
Interlock loop
A low-power circuit that opens the contactors when a connector or cover is disturbed. Stored energy can remain; it never replaces a lockout and a zero-energy test.Taught in CVT-114
Intermediate / final-stage manufacturer49 CFR 567.3
Intermediate: works between stages without completing the vehicle. Final-stage: completes the vehicle and affixes the certification label.Taught in CVT-102, CVT-103, CVT-104 +10 more
Intermediate manufacturera role
A party working between the first and final stages. A role, never a vehicle state.Taught in CVT-101, CVT-106
Intermittent / continuous dutyas published
One dated bulletin uses about five minutes on, fifteen off, and more than five minutes in every fifteen; cumulative heat, load and repetition can govern the duty rating.Taught in CVT-101, CVT-110
Interstate commercecarrier rules
Trade, traffic or transportation across a state line, including an in-state leg of such a move. Not a road class.Taught in CVT-101
Interstate System
The National System of Interstate and Defense Highways, including toll roads designated Interstate. The federal weight figures apply there and on reasonable access to it.Taught in CVT-105
Interval data
The utility's 15-minute readings of the site's load, by hour and day. What answers the night question.Taught in CVT-111
Inverter
Pack DC to motor AC, and back when braking.Taught in CVT-114
Isolated
Contactors open: the pack is disconnected, not empty. Lockout and a zero-energy test by a qualified person follow.Taught in CVT-111
IVDincomplete vehicle document
The incomplete vehicle manufacturer’s statements: ratings, vehicle types and a Type 1, 2 or 3 statement per standard. Not the completed truck’s certification.Taught in CVT-101, CVT-104, CVT-106

J

J1939
The heavy-vehicle CAN network standard: 29-bit identifiers, 250 kbit/s on body connections, 500 kbit/s also in use.Taught in CVT-110
Jobsite battery
A lithium pack with a motor-pump that runs the boom and tools engine-off; here, a held option with a written trigger.Taught in CVT-110
Joint operating angle
The bend a universal joint runs at.Taught in CVT-107
Jurisdiction level
Federal, state, local or route-specific.Taught in CVT-112
Justified refusal
What the record supports, what it cannot, why, and what would, while supported decisions proceed.Taught in CVT-102, CVT-103

K

Keep line
The old truck's next-season owning cost per ton; it moves with today's disposal price.Taught in CVT-113
Keep-out
Rail length nothing may occupy. Here, the rear tires' 191–237: the tire zone plus a 3 in planning allowance each side (2–4 in).Taught in CVT-103
Kept item
A band, what-if, comparison or bench result held with its entry to defend a line, never counted as one.Taught in CVT-108
Key-on
Energy drawn while stopped but awake: cab climate, compressor, steering, electronics.Taught in CVT-114
Kilonewton (kN)
A force of 1,000 N; newtons ÷ 9.806 65 give kilograms.Taught in CVT-101
Kinetic energy
Half the mass times the speed squared: what a stop turns into heat.Taught in CVT-108
Kingpin spread
The distance between the front kingpins, about 70 in on a 12,000 lb axle.Taught in CVT-109
Known blocker
A finding whose whole plausible band misses, or a missing product or supply. It supports SCREEN OUT in any evidence state.Taught in CVT-111
kVA
A transformer or service rating; kW = kVA × power factor.Taught in CVT-114
kWkilowatt, power
A rate: how fast energy moves.Taught in CVT-114
kW and kWh
Power, how fast energy moves (the hose); energy, how much there is (the bucket).Taught in CVT-114
kWhkilowatt-hour, energy
An amount: what a pack holds, a route uses, a bill charges.Taught in CVT-114

L

L
Feet between the group’s extreme axle centers, rounded per FHWA policy.Taught in CVT-105
Label, Floor, Cap, Clause
The four asks to a maker, in writing, before you quote.Taught in CVT-114
Labeled boundary case
A vehicle that sits outside the taxonomy's scope and is explicitly marked as such and routed, rather than forced into the nearest box. Buses (school, transit, coach) are the standing example in this course; their detailed treatment is elective.Taught in CVT-102, CVT-103, CVT-104 +10 more
Landing force
The ground's push on the feet when the driver lands, as a multiple of body weight; set by technique and steps.Taught in CVT-109
Lash
Slack in a suspension that lets the body roll before the springs push back.Taught in CVT-109
Lateral demand
The sideways acceleration a steady curve asks, in g: v² ÷ (g·R), less the superelevation.Taught in CVT-109
Lateral load transfer
Load moved from the inside wheels to the outside in a curve: W × a × h ÷ T per side on a rigid truck.Taught in CVT-109
Lateral offset
A CG off the truck's center line. About 1% of the rigid number per centimeter, taken off the band, in turns that throw the load toward the offset side.Taught in CVT-109
Launch torque
Engine torque at stall × converter ratio, planned no higher than the turbine rating the controls must hold; for a manual or AMT, clutch engagement torque.Taught in CVT-107
Leak-down
Pressure lost per minute with the engine stopped; the roadside criteria quote 2 psi released and 3 applied for a single vehicle.Taught in CVT-108
Legal in-service limitLegal rail
What the road, bridge, permit, or posting permits today: federal axle (20,000 single / 34,000 tandem) and gross (80,000) screens, the Bridge Formula, and lower local limits. Route-dependent and live.Taught in CVT-102, CVT-103, CVT-104 +10 more
Level 1, Level 2
AC at 120 V and 208/240 V; IEC Modes 1 to 3.Taught in CVT-114
Level-off temperature
Where repeated stops level a drum off: one stop's rise ÷ (1 − e −spacing ÷ τ ) above ambient.Taught in CVT-108
Lever rule
Statics for a raised lift axle: a pusher splits its load between front and tandem; a tag puts more than its load on the tandem and unloads the front.Taught in CVT-109
LFPlithium iron phosphate
A cathode with no nickel or cobalt: cheaper per kWh, heavier per kWh at the cell than nickel-rich types.Taught in CVT-114
Licensed weightregistered weight
The weight a fleet declared to the state for registration and fee purposes. Independent of GVWR — a vehicle can be inside its rating and over its licensed weight simultaneously.Taught in CVT-102, CVT-103, CVT-104 +10 more
Life-cycle emissions
Carbon from building, fueling or charging, and retiring a truck; read by grid, class and year.Taught in CVT-114
Lifecycle Screen™
The module's eight dated entries, ending in a call.Taught in CVT-113
Lift axle
An axle that can be raised off the road; this lesson’s pusher is non-driven.Taught in CVT-101, CVT-105
Limit
A documented operating boundary or physical constraint: a temperature, a shaft speed, a grip.Taught in CVT-107
Line by line
a gap split into the lines that differ, each with its present value and years.Taught in CVT-113
Linerinner insert
A second channel nested inside the rail by the chassis maker. Its rating holds only between its ends.Taught in CVT-106
Live competing reading
Evidence that also supports another primary, with the deciding record named.Taught in CVT-101
Live-dead-live
The zero-energy test: prove the meter on a known source, test the circuit, prove the meter again.Taught in CVT-114
Load centerliftgate rating
Where on the platform a gate's rated capacity is stated. One operation manual states 24 in from the platform's heel; read the gate's own manual. Record a lift weight with its load position.Taught in CVT-102, CVT-103
Load center / heel
Distance from the platform heel (the edge nearest the truck) to the center of the load. A gate’s rating holds at a stated load center.Taught in CVT-112
Load factor
A month’s kWh ÷ (peak kW × hours in the month).Taught in CVT-114
Load path · link
Every part between frame and road on one axle (axle, suspension, hubs, brakes, wheels, tires); each one, with its own rating and document, is a link.Taught in CVT-104
Load range
The sidewall letter (G, H) that, with the size, sets the tire's maximum load and pressure in the maker's table.Taught in CVT-104, CVT-109
Load state
Departure, peak, typical or return: the moment a payload describes. A payload without one is not yet a mission value.Taught in CVT-102, CVT-103, CVT-104 +1 more
Load-bearing line
A line whose answer could change the call. An open load-bearing line blocks CARRY FORWARD.Taught in CVT-111
Load-bearing UNRESOLVED
An open line that could decide the call either way. It holds a path.Taught in CVT-111
Load-inflation table
The maker's load per tire, single and dual, at each cold pressure. New-tire values.Taught in CVT-109
Load-transfer ratio
2 × a × h ÷ T on a rigid truck: 0 standing still, 1 when the inside wheels lift.Taught in CVT-109
Loaded labor rate
Wage ÷ (1 − benefit share of total compensation); the share is not a markup on wages.Taught in CVT-113
Loads a day
Completed trips on scale tickets, reweighs and voids out, over days worked; FACT-derived about the period counted.Taught in CVT-113
Locator
Where in a record: field, page, revision, ticket number.Taught in CVT-101
Lockbolt
A pin-and-collar frame fastener. Identify the system: permanent swaged collars and removable systems have different removal and replacement instructions. Follow the applicable manual.Taught in CVT-106
Lockup
The clutch that joins impeller and turbine so engine and box turn together; when it engages is a calibration.Taught in CVT-107
Long-stroke chamber
A chamber built for more pushrod travel, with its own readjustment limit.Taught in CVT-108
Longsill
One of the body's or subframe's two lengthwise members resting on the frame rails; mounts tie it to the frame.Taught in CVT-106
Loss split
A day's gallons divided by what they paid for: air, rolling, driveline, accessories, stops, idle (FEF-001).Taught in CVT-107
Low idle / work speed
700 rpm with no PTO; and the PTO preset, 1,200 rpm on the new aerial. “Idle” alone is not used.Taught in CVT-110
Low-air warning
The light and buzzer that must be on by the time reservoir pressure falls to 60 psi. Its set point is a number on the built truck.Taught in CVT-108
Lower flammable limit
The lowest gas-in-air share that can burn. Detector set points are given as a share of it.Taught in CVT-111
LP-2
Operations' load plan for the proposed truck: the densest chilled cases in the forward half of the chilled compartment, chilled CG at or forward of x 290. The worked point is x 290 exactly; a placement range needs both axles bounded and the route states run.Taught in CVT-104

M

Macrosegment
One of the five fixed market divisions: freight movement; construction/bulk/resources; environmental/public works; utility/service/installed work equipment; emergency/special-purpose. A unit receives exactly one primary placement.Taught in CVT-102, CVT-103, CVT-104 +10 more
Managed charging
Sharing site power among trucks so the meter stays near the night's average. The average is its floor.Taught in CVT-111, CVT-114
Margin
The demand clears the capacity by more than the line’s stated uncertainty.Taught in CVT-103, CVT-104, CVT-105 +3 more
Margin at the floor
(Floor energy − demand) ÷ floor energy. Likely needs 15%; Thin is anything below that which fits a new pack, a negative margin included.Taught in CVT-114
Market indicatoroptional — never decisive
A coarse ratio that narrows a placement without naming it: annual operating days, average daily distance, body/work cycles per day, and the mass-versus-volume limitation. An indicator inherits the evidence state of its inputs.Taught in CVT-102, CVT-103, CVT-104 +10 more
Mass- / volume-limited
Whether a unit exhausts its available payload before it fills its usable volume ("weighs out") or fills the volume first ("cubes out"). Determined by commodity density against the body's usable volume and the chassis's available payload — the same truck can be either, depending on what it carries.Taught in CVT-102, CVT-103, CVT-104 +10 more
MAX ROUTE MILESthe hero number
The longest logged day; what Run and Spend read.Taught in CVT-114
MCO
The manufacturer's certificate of origin: a State titling paper, separate from the federal certification label.Taught in CVT-106
Measurable mission statement
Work process, commodity, service promise, operating window and bounding quantities, each quantity with its state. Mission Log entry 102.1.Taught in CVT-102, CVT-103
Measured
A reading taken on one unit, one day, at one voltage and setting. FACT for that unit and that day only.Taught in CVT-110
Measured band
A range with a unit, a basis, a season and a source. Both ends are recorded; an average is not a band.Taught in CVT-102, CVT-103
Measured clearance
The structure's actual height above the road, from its owner's survey. It describes the beam; it never licenses a truck taller than the posting.Taught in CVT-103
Megawatt charging
Heavy-truck DC rated 3.75 MW; early sites about 1 to 1.7 MW, 2026-10.Taught in CVT-114
Method check
A run of the method on a truck whose behavior is already known, to show the method reads the site the way experience does.Taught in CVT-109
Miles per engine hour
annual miles ÷ annual hours; it decides whether an hour or a mile limit comes first.Taught in CVT-113
Minor and major repair garage
In public summaries of the repair-garage codes, minor work leaves the fuel system closed. Major work may release fuel, and one such job classifies the facility unless it is kept to isolated bays.Taught in CVT-111
Missing-input types
NOT_ON_DESK · NOT_YET_PRODUCED · NO_REFERENT · OUT_OF_SCOPE · CONTRADICTED.Taught in CVT-101
Mission Domain™Level 1
One of six addresses, judged from work evidence.Taught in CVT-101
Mission Log™module signature instrument
The evidence-locked mission and duty-cycle record built across CVT-102: eight entries, one per lesson, each carrying evidence states.Taught in CVT-102, CVT-103
Mixing and agitating capacity
A truck mixer’s two plate ratings: what the drum may mix from dry batch, and what it may carry already mixed.Taught in CVT-112
Mobile work
The body works while the truck drives on its road throttle, at road speed or walking speed: mixer drum, spreader, packing en route.Taught in CVT-110
Moment
Weight times its x. The rear axle's load times WB equals the sum of every moment.Taught in CVT-104
Mounting zone
A stretch of frame, named by position from the steer-axle centerline, that gets one kind of mount for one reason.Taught in CVT-106
Multileaf, taper leaf
Steel leaf springs: a stack that bends under load, or fewer tapered leaves. Height drops as load comes on.Taught in CVT-109
Must / should
“Must” marks a requirement; “should” a goal. Defined once per baseline.Taught in CVT-112

N

N
Axles in the group, in the truck’s state. A raised axle is out; a lowered lift axle counts only by the State’s rule.Taught in CVT-105
Nameplaterated draw
A battery's label kWh (CVT-114 term). Usable is the maker's share of it, typically about 0.90, not a standard.Taught in CVT-110, CVT-111
Nameplate energythe label
The total a pack is rated to hold: what you carry, not what you can spend.Taught in CVT-114
Nameplate, usable
A battery's label energy, and what the truck will release; 0.90 is typical, not a standard.Taught in CVT-111
Narrowest pipethe limit
Of the four pipes, the one that delivers least at the battery; it sets the rate.Taught in CVT-114
Native governing unit
The unit in which an authoritative value is stated by its source, and the only unit in which boundaries and comparisons may be evaluated. Conversion is a display operation.Taught in CVT-102, CVT-103, CVT-104 +10 more
Native unit
The unit the source used. Store the value in it; convert at the exact constant only to display or compare.Taught in CVT-101, CVT-102, CVT-103
Near-miss
An item that fits on the drawings with less margin than the build can be trusted to hold. Recorded with its margin and the request that could change it.Taught in CVT-103
Net / gross power
SAE J1349 as-installed net / J1995 gross rating basis; never compared across without a common basis.Taught in CVT-101
Net hill energy
The climb less what the descent returns: about half back out and back, nothing one way.Taught in CVT-114
Net proceeds
What the seller keeps: price less commission, fees, transport, prep and the cost of the wait.Taught in CVT-113
Neutral axis
The line through a bent section where the steel is neither squeezed nor stretched; on a symmetric channel, at mid-height. Bending stress is zero there and peaks at the outer fibers.Taught in CVT-106
Nickel-richNMC, NCA
Cathodes built on nickel: the most energy per kilogram, a higher price per kWh.Taught in CVT-114
No marginscreen verdict
A model value within 1% of the rating either side, or under it with a band that reaches it. Written with the band and a request.Taught in CVT-104, CVT-108, CVT-109
Nominalthe label
The number printed for the storage: gallons, DGE at 3,600 psi and 70°F, water capacity, kg at rated pressure, or kWh of nameplate.Taught in CVT-111
Nondivisible loadfederal definition
A load or vehicle over a limit that, split, would lose its function or value or take more than 8 workhours to dismantle. States may permit it regardless of the federal figures, under the federal permit rule.Taught in CVT-105
Nonresponsive
Wrong class for the claim: no score.Taught in CVT-101
Normalization
Restating a claim that arrived untestable into a proposition somebody could be wrong about. Where two reasonable normalizations produce two different dispositions, the output is the question returned with both readings named — never the reading that suits the writer.Taught in CVT-102, CVT-103, CVT-104 +10 more
Normalize
Restate a claim so someone could be wrong about it.Taught in CVT-101, CVT-112
Not yet gathered vs not yet in existence
Two different unresolved states. The first can be requested; the second cannot, because the document does not exist yet. Distinguishing them is what stops a request list containing items nobody can ever close.Taught in CVT-102, CVT-103, CVT-104 +10 more
NPV
the present value of every cash flow over the horizon, residual credited at the end.Taught in CVT-113

O

OAHoverall height
Ground to the truck's highest point, with its load state named. A build-up to the roof is a modeled roof height, not the highest point.Taught in CVT-103
OAL · OAH
Overall length (chassis OAL = BFA + WB + AF); overall height, with its load state.Taught in CVT-103
Odd truck
The truck whose window is shorter than the rest: the one in the shop, or back late. It often sizes the equipment.Taught in CVT-111
OEM relocation
Moving a chassis component the OEM placed. Done only with the OEM's written approval; never the first fix.Taught in CVT-103
Off-tracking
Front axle center's path radius minus the rear axle center's, fully developed: R − √(R² − WB²).Taught in CVT-109
OH / AFOverhang · after-frame
Frame extending behind the rear axle centerline. Some manufacturers' body-builder material uses AF as the primary term for this span; other manufacturers use OH. Confirm against the document in front of you.Taught in CVT-102, CVT-103, CVT-104 +10 more
On-duty total
A log’s own window; its state hours must add to it.Taught in CVT-101
Onboard charger
The truck's own AC-to-DC converter; its kW caps Level 1 and 2.Taught in CVT-114
One change, six checks
The re-run rule: any change, all six factors, then a new band and a new date. Skipping it is SE-009.Taught in CVT-114
One-maker dimension
A number that means the job only on one maker’s chassis, such as a wheelbase standing in for the space behind the cab.Taught in CVT-112
Open line
An input carried without its settling document, named with that document.Taught in CVT-113
Operating limit
A written speed, slope or rule for a named curve, site or mode, with its basis, state and owner.Taught in CVT-109
Operating line
A practice the screen names for Operations to decide. Not a request, and it changes no verdict.Taught in CVT-108
Operating map
Engine speed against torque, with the full-load ceiling and contours of equal efficiency. A route state lands by its demand and its gear.Taught in CVT-107
Operating pattern
Days that run the same way — stop list, windows, load mix. A sample speaks only for the patterns it covers; one day in each, plus the heaviest day, is the starting plan.Taught in CVT-102, CVT-103
Operating statethe O in ROLE
One of the five mutually exclusive conditions that account for every hour of a defined working period: driving loaded, driving empty, stationary work, idle, dwell. Defined before measurement, not after.Taught in CVT-101, CVT-102, CVT-103 +11 more
Order acknowledgment
The chassis OEM’s confirmation of an order, relayed by the dealer: the build slot and the chassis change cutoff.Taught in CVT-112
Orphan / widow
A line with no need behind it; a need with no line in front of it.Taught in CVT-112
Out of band
An input below 0.30 V or above 4.25 V on this chassis: read as a fault, engine to low idle.Taught in CVT-110
Out of service
An enforcement order that parks the vehicle until the defect is repaired.Taught in CVT-108
Out-of-shift field
Where the truck’s hours outside the on-duty window go: pre-cool, standby, yard work, washout. Never in the denominator.Taught in CVT-102, CVT-103
Outer bridge
The group from the first to the last axle on the road in the truck’s present state. On unit 31, pusher down, group 1–4.Taught in CVT-105
Output retarder
A fluid retarder at the transmission output; its power follows driveline speed. An option on BA-1.Taught in CVT-108
Overscreen verdict
The demand exceeds the capacity by more than the stated uncertainty.Taught in CVT-108, CVT-109
Over on the model
A model value 1% or more past the rating, written with the band's floor, never as an exact overage.Taught in CVT-104
Over-the-air update
A software or parameter change sent through the telematics device, with the key on and the engine off, at the yard.Taught in CVT-110
Overdrive
A gear below 1.00, output faster than input; a 1.00 gear is direct drive, written × 1.00.Taught in CVT-101
OverlayState rule type
A State or local rule that changes a figure off the Interstate: by road class, spacing, commodity, season or structure.Taught in CVT-105
Own job
Billed on its own line or contract, or dispatched alone.Taught in CVT-101
Owner maprecord entry 101.1
For each tag: the customer-side party responsible for it, the suppliers that execute it, the document that proves it. Three columns, never merged.Taught in CVT-101
Owning cost (of a season)
Repairs, days down at the day value, resale given up and interest on the resale, for one more year of keeping a truck; "paid off" changes none of them.Taught in CVT-113

P

Pack weight per kWh
Pounds of battery, housing included, per kWh of nameplate: about 11 to 16 as of 2026-10.Taught in CVT-114
Pack-level lb per kWh
Weight per nameplate kWh, housing included: about 11 to 16, 2026-10.Taught in CVT-114
Packed cargo volume
The sum of each pallet's envelope (footprint × stack height), or tote count × tote volume. Excludes gaps between pallets, aisles and handling clearances.Taught in CVT-102, CVT-103
Parameter / default
A stored setting inside a controller, and the value it ships with until someone changes it. Some can be changed only by the OEM.Taught in CVT-110
Parameter log
The dated record of every work setting: value, default, owner, and every change with who, when and why.Taught in CVT-110
Parameter print-out
A dealer-tool report of a controller's settings: FACT for that truck that day; evidence of a change only against a baseline.Taught in CVT-110
Parking brake
On BA-1, the spring brakes on the rear axle: a spring applies them and air holds them off.Taught in CVT-108
Part load
Running well below the full-load curve, where fuel per unit of work rises.Taught in CVT-107
Pass line
A measurable condition, written before the truck exists, that a test can fail.Taught in CVT-112
Pattern coverage
Operating days in the patterns a sample observes ÷ annual operating days. It says which days a sample can speak for, not how well it speaks for them.Taught in CVT-102, CVT-103
Payloadtrade word
The cargo and occupants a vehicle carries, or is permitted to carry. Not issued by anyone — it's the lowest applicable ceiling minus a measured empty weight.Taught in CVT-101, CVT-102, CVT-103 +11 more
Payload CG
For an even load, the floor height plus half the stack. Density sets the stack; the same pounds of a denser load sit lower.Taught in CVT-109
Payload exhausted
Added tare above P: stop, no number after it.Taught in CVT-101
Payload on the screen
The ceiling minus a weighed tare, on the federal Interstate screen only. On unit 31, 27,900 lb with the lowered pusher counted; whether it counts is the State’s rule (105.6).Taught in CVT-105
Payload statement
One sentence with four parts: the payload, the truck, the rule state with its read date, and the roads it covers. Anything less is a number.Taught in CVT-105
PDI, D&A
The dealer’s pre-delivery inspection (component checks), and the lessor’s Delivery & Acceptance certificate the fleet manager signs.Taught in CVT-112
Peak / continuous ratingelectric motor
Peak: what the motor makes for a stated time, often 10–30 s. Continuous: what it holds without overheating under stated conditions. Screen sustained grades on it and ask what the motor makes for the climb's actual duration.Taught in CVT-107
Peak demand
The highest 15-minute demand a bill records in a month, with no hour attached. No other interval that month drew more; how much less is what interval data shows.Taught in CVT-111
Peak payload
The heaviest load state in the day, often the departure peak ; it meets the gross-mass screen, while axle loads also need load positions. The summer peak is a separate question.Taught in CVT-102, CVT-103
Peak single lift
The heaviest single item moved, as lifted, with load position and rider status. One lift, not a per-stop value; a requirement, never a part.Taught in CVT-102, CVT-103
Peer spec
A spec taken from another fleet's choice or a trend instead of this fleet's measured duty cycle; allowed only as a labeled comparison.Taught in CVT-102, CVT-103, CVT-111
Per rail / framethe basis
Per rail: one rail's moment or rating. Frame: both rails together. A frame moment is halved before it meets a per-rail RBM, with equal sharing stated as an assumption.Taught in CVT-106
Percent grade
Rise ÷ run × 100. Not degrees: 6% is about 3.4°.Taught in CVT-102, CVT-103
Performance curvetorque and power vs rpm
The maker's published torque and power at each engine speed for one rating. FACT about the sheet, true for its edition and basis.Taught in CVT-107
Permit
A State document that names its vehicle, its route or counties, its dates and its axle weights, carried in the cab. It covers nothing it does not name.Taught in CVT-105
PGN / SPN / source address
A parameter group (one message), a signal inside it, and the sender's address stamped on it.Taught in CVT-110
Pilot
one truck run and measured before volume; a paper pilot is a signed desk review.Taught in CVT-113
Planning figure
A number computed for an order from ratings and estimates. A fact about the worksheet; an assumption about the truck.Taught in CVT-102, CVT-103
Planning floor
The health you assume in the last year you need the truck on this route.Taught in CVT-114
Planning limit
The screen's bulk-drum planning line, from the grade-severity method, which keeps an emergency-stop reserve; not a fade point.Taught in CVT-108
Planning price
The dated value a screen uses for a volatile input; here Finance's $4.49 (PS-1, 06-05).Taught in CVT-113
Portable-scale allowancefederal weight rule
The one exception to “inclusive of all tolerances”: an allowance for a wheel-load weigher's error, never over 5%. A property of the instrument.Taught in CVT-105
Posted bridge
A structure carrying a lower weight limit set by its road owner. What the sign allows a given truck depends on the posting's terms.Taught in CVT-105
Posted clearance
The number on the sign, which governs routing. Conventions for setting it vary by authority, and the sign does not say which.Taught in CVT-103
Posted clearance · measured clearance · margin
What the sign says, and what governs routing; what the structure measures; the space left between the measured truck and the clearance it is compared with.Taught in CVT-103
Posted structure
A bridge or road with its own lower limit, set by its owner. The sign's words are a fact; what they allow is in the posting's terms.Taught in CVT-105
Posted · measured clearance · margin
What the sign says; what the structure measures; the space between the truck and the structure. Three different numbers.Taught in CVT-103
Posting margin
Measured minus posted clearance: 0 to 12 in in the sources read.Taught in CVT-112
Potential claim
A failure inside a warranty's term; whether it's paid is the warrantor's decision (the maker or dealer that issued it, not the owner who holds it).Taught in CVT-113
Pounds per inch
Load moved from rear to front per inch of added wheelbase: L·x ÷ WB² for a load fixed at x.Taught in CVT-104
Powerhp, kW
Rate of doing work: hp = lb-ft × rpm ÷ 5,252; kW = N·m × rpm ÷ 9,549. At a road speed, wheel force = power ÷ speed.Taught in CVT-107
Power Path™entry 107.1
The evidence-based powertrain record this module builds, from engine to tire. Entry 107.1: Demand.Taught in CVT-107
Power Path™ entry 107.5
The evidence-based powertrain record this module builds, from engine to tire. Entry 107.5: Speeds.Taught in CVT-107
Power Path™ entry 107.7
Entry 107.7 of the module's powertrain record: Limits.Taught in CVT-107
Power sharing
One DC cabinet splitting its kilowatts across its dispensers.Taught in CVT-114
Power take-offPTO / ePTO
A drive off the transmission or engine that powers a body function (a packer, pump, or crane). Its own interface: the PTO's torque and duty must match the transmission's provision and the body's demand.Taught in CVT-102, CVT-103, CVT-104 +10 more
Power-unit allowance
Up to 2,000 lb more on an electric power unit on the Interstate and reasonable access to it, never above 82,000 lb; beyond that the state decides.Taught in CVT-114
Powertrain
Engine, transmission, driveline and drive axle, wheels and tires: crankshaft to road.Taught in CVT-101
Powertrain matching
The interface that turns engine torque into road speed: engine sweet spot → transmission top gear → axle ratio → tire rev/mi → road speed. Matched correctly, cruise RPM sits in the engine's band at the real speed while the gearing still launches and climbs at loaded weight.Taught in CVT-102, CVT-103, CVT-104 +10 more
Pre-cool
Running the refrigeration unit on the empty box to pull it down to temperature before loading. Standby holds a loaded box at temperature.Taught in CVT-102, CVT-103
Precedence order
The written tie-breaking list that decides which state an overlapping minute belongs to, including named speed and load thresholds. Travels with the numbers.Taught in CVT-102, CVT-103
Precision band
The range a stated value is allowed to cover, written down by whoever records it. A decision the band straddles cannot be settled by that value.Taught in CVT-102, CVT-103
Preference
A wish whose absence fails no measurable mission outcome. Recorded with its source; may break a tie, never displaces a requirement.Taught in CVT-102, CVT-103
Preliminary recommendation
A powertrain defended from the evidence on file, with the maker's approval and the run still owed. Never “final.”Taught in CVT-107
Present value (NPV)
Future costs discounted to today at the owner's rate, so different years can be added.Taught in CVT-113
Pressure for load
The lowest cold pressure whose row covers the heaviest load that tire carries in any state.Taught in CVT-109
Pressure protection valve
A valve that opens a circuit above a set pressure and isolates it below a lower one.Taught in CVT-108, CVT-110
Preview
a model's first version, open lines and owner named.Taught in CVT-113
Pro forma
a year-by-year layout of scheduled events and unscheduled budgets over the life.Taught in CVT-113
Proposed solution
Hardware the customer names (“26-ft reefer, 3,000-lb gate”). Kept in its own field as evidence of what the customer believes; not promoted to a requirement on request (SE-101). A constraint the customer confirms, with its basis, goes in a field of its own.Taught in CVT-102, CVT-103
Protected
What the plan holds back: a reserve, a refuel habit, a battery’s assumed aging floor.Taught in CVT-111
Prove → Mark → Stop → Ask
The defense routine: documents, assumptions, limits, requests.Taught in CVT-101, CVT-107, CVT-109 +1 more
Provisioning
An installed capability or interface that indicates possible intent without establishing use. Body-builder wiring is a provision. It is not a body, a mission, a work-power fact or a duty cycle.Taught in CVT-102, CVT-103, CVT-104 +10 more
PTOpower take-off
Power take-off: a gearbox that borrows rotation from the transmission, engine or driveline to drive body equipment, often a pump.Taught in CVT-101, CVT-110
PTO max engine speed / PTO output limit
Max engine speed: the engine's cap in PTO mode, a parameter (1,290 rpm on this order; default 2,000). Output limit: the PTO shaft's own top speed, 2,500 rpm, reached at 2,101 engine rpm at 119%.Taught in CVT-110
PTO ratio% of engine speed
PTO output speed as a percentage of engine speed. Pump rpm = engine rpm × ratio.Taught in CVT-110
PTO-ready
In PTO mode with no PTO work; counted in PTO hours.Taught in CVT-101
Public domain
Not under copyright; the federal rule text used here is an example.Taught in CVT-101
Public-procurement proxy
A public buying rule read as practice by a private buyer, with its edition date; whether the rule itself reaches the purchase is the funding owner’s record.Taught in CVT-112
Publication date
The day a rule appears in the Federal Register.Taught in CVT-112
Publicly available
Reachable by anyone; silent on rights.Taught in CVT-101
Pull at the tires
A retarder's power as force at the drive tires: hp × 375 ÷ mph.Taught in CVT-108
Pump-and-roll
A fire pump flowing while the apparatus moves. Possible with a front-crank, flywheel or PTO-driven pump; never with a split-shaft.Taught in CVT-110
Pusherlift axle
A lift axle ahead of the drive tandem. Unit 31’s sits 60 in ahead of the first drive.Taught in CVT-105
Pusher (lift) axle
A liftable axle ahead of the drive tandem. Whether a lowered one counts as an axle under the formula is each State's call, even on the Interstate.Taught in CVT-105
Pusher, tag
A non-driven axle ahead of the drive axles (pusher) or behind them (tag).Taught in CVT-101, CVT-109

Q

Qualified electrical worker
Whoever is qualified and authorized for depot electrical equipment and charger cabinets; truck training alone does not qualify anyone.Taught in CVT-111
Qualified techniciansome programs say authorized
Trained and authorized in writing by the employer for high-voltage work on the truck.Taught in CVT-114
Quoted price
The number a dealer prints, on the dealer's basis.Taught in CVT-113

R

R&M
Repair and maintenance, tires excluded in this module.Taught in CVT-113
RACIresponsibility assignment matrix
A grid that gives each decision its Responsible, Accountable, Consulted and Informed parties.Taught in CVT-112
RAILcourse device
Rated, As-built, In-service, Legal: the four layers of a weight number.Taught in CVT-101, CVT-104
Ramp holdpart throttle
Holding a truck still on a grade with the throttle: part-throttle slip; use the service brake.Taught in CVT-107
Rated cargo loadfederal label rule
The label floor’s cargo term; the nearest rule word to payload.Taught in CVT-101
Rated powerand governed rpm
The rating's headline power and the rpm it is made at (2,200 for Q-1); governed rpm caps fueled speed; a downgrade can still overspeed the engine past it.Taught in CVT-107
Ratingthe maker's number
GVWR or GAWR: what the maker built the truck or an axle to carry. Holds on every road; describes none.Taught in CVT-105, CVT-107
RBMresisting bending moment, lb·in
S × yield: the moment one rail carries when its outer fiber reaches yield. Printed per rail; a frame equivalent is twice that and is labeled frame.Taught in CVT-106
Re-screen trigger
Named evidence that reopens a held or screened-out path the day it arrives.Taught in CVT-111
Reactionaxle load
What one axle carries: rear = Σ(w × x) ÷ WB; front = gross − rear. Front-axle datum, x positive rearward.Taught in CVT-104
Read date
The day someone opened the current text and copied from it into the pack.Taught in CVT-105
Readily attachable componentfederal label rule
A part such as a mirror or tire and rim assembly whose addition leaves the stated ratings valid.Taught in CVT-101
Readiness ladder
Research, pilot, early commercial, mainstream, judged on heavy trucks, not phones or cars.Taught in CVT-114
Readjustment limit
The stroke the carrier brake rule sets for each chamber type; long-stroke chambers have their own.Taught in CVT-108
READY FOR NEXT REVIEWlocked string
Every input this line needs is in the file; the next review reads the revised document. Never a release.Taught in CVT-106
Ready to loadthe case's tare
Everything aboard but cargo, tanks full, driver in.Taught in CVT-101, CVT-104
Rear fishplate bracketa stop
On a U-bolt body, a plate bolted to the web and the sill as the last rear attachment: a stop, not the 106.6 reinforcement fishplate.Taught in CVT-106
Rear share
The fraction of a load at x that the rear axle carries, x ÷ WB. Above 100% behind the rear axle, where the front share turns negative.Taught in CVT-104
Rearmost pointvs lowest rear point
Rearmost: the stowed gate’s face, 125.6 in behind the axle, for tail swing (103.7). Lowest: the member 22 in up at 122 in, for departure.Taught in CVT-103
Rearward amplification
The last unit's peak sideways acceleration over the first's in a quick lane change.Taught in CVT-108
Reasonable accessfor weight
Access to and from the Interstate to terminals and facilities for food, fuel, repairs and rest, under the statute's access clause. The State shows which roads qualify. Not the National Network's dimension rule.Taught in CVT-105
Recommendation / decision
What the evidence supports, with its basis and flips / the act of whoever signs: release, award, replace, sell.Taught in CVT-113
Reconciliation
Summing the state hours against the window. Short means a missing state; over means double counting; exact is necessary but not sufficient.Taught in CVT-102, CVT-103
Reconciliation · residual
Explaining a ticket-to-ledger gap from the truck as it stands, by each found item's axle share; the residual is what is left.Taught in CVT-104
Recovery
The time to restore pressure after a demand; on the alternate, the compressor refilling what a re-air took.Taught in CVT-108
Red Line
One of six coded critical errors that fire a state transition to RETAKE REQUIRED rather than a points deduction. Unaffected work is preserved; the triggering claim and its dependencies are corrected and reverified, and the ledger records the code, the affected claim IDs and the recheck.Taught in CVT-102, CVT-103, CVT-104 +10 more
Reference Grid™module signature instrument
The dimensional reference-point record this module builds; Reference Grid entry 103.1, datums & documents, is its header.Taught in CVT-103
Reference Materialfederal multistage rule
Guidance the IVD incorporates by reference, deemed part of it. Its edition is evidence.Taught in CVT-106
Reference pointFoundation 4 · previewed
The datum a dimension is measured from and to.Taught in CVT-102, CVT-103
Refill window
The hours a truck can refill between post-trip work and the start of pre-cool: 4:00 p.m.–3:00 a.m., 11.0 h, on the account.Taught in CVT-111
Refusal on file
The reply that answers the customer's ask with the dated plan, declines in one plain line what the evidence cannot carry, and sets a re-screen date.Taught in CVT-111
Regen
An electric truck's motor braking as a generator through the drive axles; cut back by the pack, the road and ABS events.Taught in CVT-108, CVT-114
Regenerationpassive, active, parked
Burning soot out of the DPF: on hot highway exhaust, by the engine raising exhaust heat, or at fast idle started by the driver.Taught in CVT-107, CVT-111
Registered / licensed weightLegal rail
The weight an owner declared to the state and paid fees on. A fee and enforcement basis, independent of GVWR — a vehicle can be inside its rating and over its registered weight at once.Taught in CVT-102, CVT-103, CVT-104 +10 more
Registered weight
The mass a fleet declares to a state for registration, fees and permits. Not a manufacturer rating, not a measurement, and not a road limit — a fourth figure that reads like all three. It never answers a licensing or capacity question.Taught in CVT-102, CVT-103, CVT-104 +10 more
Release-holding request
A request whose answer changes the chassis order itself; the release waits for it.Taught in CVT-110
Relief valve
The valve that caps circuit pressure; flow it dumps becomes heat, about 1.5 × psi × gpm BTU per hour.Taught in CVT-110
Remote throttle
An engine-speed request from outside the cab. On this chassis an analog input: 0.75–3.75 V is the linear request, 0.30–0.75 V no request, 3.75–4.25 V full request.Taught in CVT-110
Renewable diesel, B20
Fuel options on the diesel path: renewable diesel meets the diesel specification; B20 needs the engine maker's approval.Taught in CVT-111
Reposition
A pole-to-pole move of a few hundred feet at walking speed with the boom stowed. On the new aerial, driven with the PTO off.Taught in CVT-110
Reproducible
A second person with the same cited inputs and method gets substantially the same number. It proves the recipe, not the inputs.Taught in CVT-112
REPTO
Rear-engine PTO at the flywheel housing; engine-driven, so it turns in any gear.Taught in CVT-101
REPTO, FEPTO, flywheel PTO
Engine PTOs at the rear of the engine, the front of the crankshaft, or between engine and transmission. They turn with the engine, moving or not.Taught in CVT-110
Request
The document a line waits for, with the party that issues it. A line closes when its document arrives, never on a promise.Taught in CVT-106, CVT-107
Request for quotation (RFQ)entry 112.6
The buyer’s written request for prices against a stated baseline, with its terms and evaluation rules.Taught in CVT-112
Request types
Request existing · schedule stage-gated · hold.Taught in CVT-101
Requirement
What the truck must do, as a quantity with unit, basis and evidence state, naming no hardware.Taught in CVT-102, CVT-103
Requirement lineentry 112.3
ID, the need with its measure, value, unit and condition, a verification method, a trace, an owner and the state of its values.Taught in CVT-112
Requirement statement
What must be true, its entry, evidence and state, the owner who sizes it, and what is still open. Never a size, rating or model.Taught in CVT-102, CVT-103
Resale given up; interest on the resale
Today's sale price less next year's; and what today's price would earn at the account's rate if it weren't left in the truck.Taught in CVT-113
Rescue sheetemergency response guide
A short guide for responders to one vehicle as built: disconnects, fire, submersion, towing.Taught in CVT-114
Reserve capacity
Minutes on a 25 A load at 80 °F to 10.5 V. RC ÷ 2.4 is the 25 A-rate capacity, not the 20-hour rating.Taught in CVT-110
Residual
The truck's planned worth when the account lets it go.Taught in CVT-113
Residual band
A planning range for a sold price at an age, with a driver, a trigger and a review date; asking prices run above sold.Taught in CVT-113
Residual guarantee
A residual or buy-back a named party has signed for in writing, on its stated conditions; nothing less.Taught in CVT-113
Residual value
What the truck resells for at the end of the hold. An assumption until a named party guarantees it.Taught in CVT-114
Response matrix
Each bid’s answer to each line with its verdict. Never “compliance matrix.”Taught in CVT-112
Responsible (R)
Does the work behind a decision. A decision may have more than one R.Taught in CVT-112
Restart floor
The depth a bank that must still start the engine is budgeted to: 50% for flooded starting batteries.Taught in CVT-110
Restrictionfederal CDL rule
A limitation on a CDL, usually from how the driver tested — E, L, Z, O, K, M, N, V. Restrictions remove privilege. There is no air-brake endorsement; air brakes produce a restriction.Taught in CVT-101, CVT-102, CVT-103 +11 more
Retarder
Any device that slows the truck without the foundation brakes: the exhaust brake on PQ, or the output retarder option. It never holds a stopped truck.Taught in CVT-108
Retarding power
The power a device takes off the moving truck without the foundation brakes.Taught in CVT-108
Retention clock
How long a record is kept, and the event that starts the count.Taught in CVT-108
Rev/mitire data book
Revolutions per mile of an exact tire, new and at load, from its maker’s data book; never from a diameter.Taught in CVT-101
Reversal test
Could a plausible value of a weak input reverse a named decision built on it? A priority test: if not, the gap ranks below those that can, keeps its label and keeps any check it owes elsewhere.Taught in CVT-102, CVT-103, CVT-112
Revolutions per mile
How many times a tire turns to cover one mile — roughly 20,168 ÷ tire diameter in inches. Converts wheel speed to road speed and acts as part of the effective gearing; a taller tire has fewer rev/mi.Taught in CVT-102, CVT-103, CVT-104 +10 more
Rights legend
Holder, terms seen, use, permission record.Taught in CVT-101
Rights status
What you are permitted to do with a source, recorded alongside authority and applicability. Public availability is not public domain.Taught in CVT-102, CVT-103, CVT-104 +10 more
Ripple
Re-running every entry after one change, then re-dating each call.Taught in CVT-111
Road load
The forces at steady speed: grade (10 lb per 1,000 lb per %), rolling resistance and air drag. Wheel hp = force × mph ÷ 375.Taught in CVT-107
Road rule
A State's or road owner's limit for a road class or a structure: State highway figures, county rules, a bridge posting. UNRESOLVED until its text is read and dated.Taught in CVT-105
Road-design template
A design vehicle such as SU-30 or SU-40 used to lay out roads. Not a truck's capability.Taught in CVT-103
Road-speed limitECM setting
An ECM setting that limits powered road speed; it does not prevent downhill overspeed. A setting, not a requirement.Taught in CVT-101, CVT-107
ROLE
Route · Operating states · Load · Environment. The four questions every mission record must answer.Taught in CVT-102, CVT-103
Roll stiffnessroll rate
How hard a suspension resists the body's lean in a curve. Rarely printed; when it is not, the line is a request.Taught in CVT-109
Roll-only stability
Senses lateral acceleration against a roll threshold and slows the truck; no steering or yaw sensing, so it cannot hold the path.Taught in CVT-108
Rollover threshold
SSF times the compliance factor: the static, steady-state lateral acceleration at wheel lift. Carried as a band with its state.Taught in CVT-109
Roomon an axle
The axle's rating minus its ready-to-load load: what the payload may add to that axle.Taught in CVT-104
Rotation
The direction the PTO output turns, engine direction or opposite, always stated with its viewpoint. Read off the PTO maker's sheet.Taught in CVT-110
Route distribution
The share of a route by road class, with its basis stated: share of distance or of moving time.Taught in CVT-102, CVT-103
Route energy
What one day draws from on-board storage: propulsion, work loads, idle or key-on, and warm-up, at the tank or the battery.Taught in CVT-111
Route-day
One route on one day with no truck to run it: truck-days lost minus what the spares covered.Taught in CVT-114
Rubber isolatorisolated mount
A rubber spacer between the frame and body brackets that holds down, damps and lets a little movement through in every direction.Taught in CVT-106
Rule pack
The dated road rules for every segment a truck will run, with who read them and when.Taught in CVT-105, CVT-112
Rule state
The text a screen ran under, cited by section, with the date it was read, its scope and every choice the screen made for a State (such as counting the pusher).Taught in CVT-105
Rule version
The identifier stored with every derived value naming the formula that produced it, so a rule revision recomputes new work without silently altering historical results.Taught in CVT-102, CVT-103, CVT-104 +10 more
Rule-pack entryRP-01 to RP-11
Citation, level, issuing body, edition, effective date, scope, result and owner for one rule.Taught in CVT-112
Rulebook
A rule type run on the case truck as an ASSUMPTION, never as the account's State.Taught in CVT-105
Run, Spend, Plug, Carry, Fix, Pay
The six factors in CPU order: route (10), energy margin (30), charging fit (20), payload headroom (10), service and uptime (10), cost resilience (20).Taught in CVT-114

S

S, SMsection modulus, in³
I divided by the distance from the neutral axis to the outer fiber (half the height on a channel). Geometry only: the same shape has the same S in any material.Taught in CVT-106
S-cam drum brake
Chamber, slack, camshaft and an S-cam that spreads two shoes against a drum; written diameter × width, as 16.5 × 7.Taught in CVT-108
Safe state
Where a function goes on a fault or loss of power, chosen in advance and written on the order.Taught in CVT-110
Sag, hog
Sag: a smile between the supports, bottom flange stretched. Hog: a frown over a support, top flange stretched. Screen both.Taught in CVT-106
Said · Logged · Seenevidence source types
What someone told you, what a system recorded, what you observed. Every Mission Log™ claim carries its source type and holder.Taught in CVT-102, CVT-103
Salient characteristics
The measurable features an “equal” must match.Taught in CVT-112
Same truck
Two quotes whose axle stations and ratings match line by line; everything else is a priced difference or an open check.Taught in CVT-113
Sample share
Observed days ÷ annual operating days. It measures size, not representativeness.Taught in CVT-102, CVT-103
Scale ticketthe In-service rail
A certified scale's printed reading by axle and gross: a fact about one truck, one day, one condition.Taught in CVT-104
Scale tolerance
The measurement uncertainty of a certified scale — how far the reading may sit from true weight. A property of the instrument, not pounds you may add to a limit.Taught in CVT-102, CVT-103, CVT-104 +10 more
scfmstandard cubic feet a minute
A compressor’s gas flow; 139.3 scf of natural gas carries one DGE.Taught in CVT-111
Scopea fact about
What a number describes: a document, a sign, a measured truck on a date, a load condition.Taught in CVT-112
Screen call
CARRY FORWARD, HOLD FOR EVIDENCE or SCREEN OUT, for one mission as of a date, with its trigger.Taught in CVT-111
Screen calls
CARRY FORWARD, HOLD FOR EVIDENCE, SCREEN OUT (for this mission, as of a date). Made in 111.7; predicted in entry 111.1.Taught in CVT-111
Screen factor× 3.0 quarry; 2.5 lower bound
The multiplier on the static per-rail moment for rough-road and fatigue loads; practice 2.5–3 (INFERENCE); the maker governs. Printed beside every screen word.Taught in CVT-106
Screen line
One comparison on the truck as quoted, with a verdict, its weakest input’s state, and a request or the reason none applies.Taught in CVT-108, CVT-109
SE-001WRI 91 · primary home 102.4
Describing the duty cycle with adjectives instead of measured operating data.Taught in CVT-102, CVT-103
SE-004WRI 93 · primary home 104.5
The load is checked against GVWR only, while an axle runs over its GAWR.Taught in CVT-104
SE-006WRI 91 · primary home 104.3
The lowest component rating in the load path is not identified.Taught in CVT-104
SE-007WRI 84 · primary home 103.4
Cab-to-axle or wheelbase selected before body and equipment geometry is locked.Taught in CVT-103
SE-012WRI 77 · primary home 103.5
After-frame insufficient or excessive for the body, hoist, liftgate or towing equipment.Taught in CVT-103
SE-014WRI 94 · primary home 104.6
An equipment center of gravity assumed, omitted or measured from the wrong datum.Taught in CVT-104
SE-026WRI 93 · reinforced 104.5
Equipment or load behind the rear axle is entered at its own weight or left out of the axle split.Taught in CVT-104
SE-032WRI 80 · primary home 103.1
Dimensional terms or datums mixed across OEM and body-builder documents.Taught in CVT-103
SE-035, SE-075, SE-078, SE-013
Loads not summed; route energy without work loads; thermal sized to steady state; a PTO that does not fit its body.Taught in CVT-114
SE-053WRI 72 · reserve list
Rear overhang and departure angle incompatible with the route or work site.Taught in CVT-103
SE-094WRI 94 · reinforcement
A measurement convention (datum, sign or unit) changes between documents and a number crosses unconverted.Taught in CVT-104
Seam
A narrow range between two thresholds that a source states in two units, where the stated values are not exactly equal. Recorded and escalated, never resolved by preference.Taught in CVT-102, CVT-103, CVT-104 +10 more
Second life
A used pack put to work elsewhere, usually stationary storage. Its value is capped by new storage prices.Taught in CVT-114
Secondary field
Other work, filed with its basis; never blended or split.Taught in CVT-101
Secondary process
A real, recorded work process that is not dominant. Stored in its own field, never blended into the segment name and never used to create a hyphenated segment.Taught in CVT-102, CVT-103, CVT-104 +10 more
Section change
Where the section or stiffness steps: a reinforcement end, a crossmember.Taught in CVT-106
Seesawoverhang effect
A load behind the rear axle puts more than its weight on the rear and takes the same extra off the front.Taught in CVT-104
Segmentation fields
The eight fields that make a placement auditable: commodity/process, load behavior, mobile/stationary work, customer/service promise, operating environment, body/equipment family, loading/unloading method, and uptime pattern.Taught in CVT-102, CVT-103, CVT-104 +10 more
Self-steer
A lift axle whose wheels follow the turn going forward. Many raise automatically in reverse; some lock straight. The axle’s spec says which.Taught in CVT-105
Sensitivity
A value carried beside the budget basis, named and dated, to show how far the answer moves if it is true.Taught in CVT-110
Separate axlesspread or split pair
Consecutive axles more than 96 in apart. Each is a single axle; the pair's combined figure comes from the bridge formula.Taught in CVT-105
Service brake
The foot valve works the brakes on all wheels. On BA-1, two air circuits feed them.Taught in CVT-108
Service description
The load indices and speed symbol after the size, such as 144/142L.Taught in CVT-109
Service promise
The outcome the customer is guaranteed, as distinct from the goods or material moved. Frequently the only field that resolves an ambiguous placement between two otherwise identical units.Taught in CVT-102, CVT-103, CVT-104 +10 more
Service rating
What the building's electrical service can carry: √3 × volts × amps for three-phase. The planning limit takes the course's 80% planning convention and a power factor.Taught in CVT-111
Service state
How the storage is made safe to work on, tow or inspect: drained, defueled or vented, depressurized, isolated, by the maker’s procedure.Taught in CVT-111
Set cut
The cut the steering stops allow on the built truck, on its own tires and wheels. Measured at delivery; UNRESOLVED until then.Taught in CVT-109
Set-forward · set-back
Steer-axle positions under the same cab. Set-back moves inches from AC to BFA; at a fixed wheelbase CA grows by the same inches.Taught in CVT-103, CVT-109
Share ahead
Body ahead of the rear axle ÷ body outside length. Planning screen 60–65%; normalized tables run about 59–65%; the screening floor is the body's geometric midpoint ahead, which is not its loaded center of gravity.Taught in CVT-103
Shear platerigid mount
A plate bolted through the rail web and welded or bolted to the sill, never welded to the rail. It carries vertical, side and fore-aft loads and lets almost nothing move.Taught in CVT-106
Shear, bending momentlb; lb·in
Shear is the running total of forces along the frame; moment is the running total of shear and peaks where shear crosses zero.Taught in CVT-106
Ship-through
The chassis travels from the OEM’s plant to the body builder for completion before delivery.Taught in CVT-112
Short, long, metric ton
2,000 lb; 2,240 lb; 1,000 kg (t).Taught in CVT-101
Side load
Half the axle load plus Σ(axle share × offset) ÷ track; each tire is then read at the pressure it runs.Taught in CVT-104
Sign or site reading
What a sign, dock or supply point says, or how many there are. Nothing about the truck.Taught in CVT-102, CVT-103
Sign-off trail
The dated record of who reviewed and who signed a baseline. The registry’s evidence for SE-105.Taught in CVT-112
Simultaneous-demand window
The period when the most units need site power at once: from 3:00 a.m. at the food-service depot on the stated schedule, when all 18 need it.Taught in CVT-102, CVT-103
Single / tandem / tridem
One, two, or three axles grouped together. Legal weight limits apply to the axle group , not only single axles.Taught in CVT-102, CVT-103, CVT-104 +10 more
Single axlefederal definition
All wheels whose centers fit between two planes 40 in apart across the vehicle. Two axles 40 in apart or closer are one single axle for weight.Taught in CVT-105
Single line, dual line
The load a tire carries alone, and the lower load it carries as one of a pair.Taught in CVT-109
Single · dual rating
A tire's maximum load mounted alone, and mounted beside another on the same end. The dual figure is lower.Taught in CVT-104
Single-arc site screen
The width one steady full-lock arc needs: wall − √(inside² − (wall − usable street)²), using no more street than the wall radius.Taught in CVT-109
Single-axle check
Each axle against the federal 20,000 on its own, including any one axle of a group. It is not one of the groups.Taught in CVT-105
Site share
One truck’s part of the site’s service, metered at the wall: × 0.90 at the battery.Taught in CVT-114
Slack
Hours parked ÷ hours of charging on the worst night; under 1.0 the truck leaves short.Taught in CVT-114
Slack adjuster
The lever from pushrod to camshaft. An automatic slack takes up wear itself; one that needs repeated hand adjustment points to a fault.Taught in CVT-108
Sodium-ion
A cell that swaps lithium for sodium: cheap materials, strong in deep cold, lower energy density; small vehicles so far.Taught in CVT-114
Spacer, longsills
The strip (1 in) and the body's lengthwise sills (7 in) between frame top and body crossmembers.Taught in CVT-103
Spacing revision
A proposed change to axle stations to buy ceiling, like AQ-2’s drives 24 in rearward. Every result on it is ASSUMPTION until a truck is built and weighed.Taught in CVT-105
Spec Architect
Your seat: guides the customer’s decisions and keeps the record of them across every vendor; decides none of them.Taught in CVT-101
Spec Baseline™
The one-page, evidence-locked requirements baseline this module builds; entry 112.1 records stages, gates, owners and dates.Taught in CVT-112
Spec Baseline™, one page
Entries 112.1 to 112.8 on one sheet, each dated and stated.Taught in CVT-112
Spec Case File™
The named six-part deliverable produced for each case: atomic six-tag Spec DNA record, market placement, duty-cycle calculations, evidence ledger, unresolved request, and a 90-second technical defense — produced in that order.Taught in CVT-102, CVT-103, CVT-104 +10 more
Spec DNA™ record
One truck’s six tags as atomic claims, each with its paper, evidence state and any open request.Taught in CVT-101
Spec Signature™
The quantified description of what a vehicle is asked to do: thirteen minimum fields covering distance, days, stops, speed, road mix, grade, loaded states, idle, work time, dwell and climate. Replaces adjectives with numbers that carry units, sources and rounding rules.Taught in CVT-102, CVT-103, CVT-104 +10 more
Spec Source™
This course's two-part evidence system. The class says which kind of record can answer a question at all — governing rule, certification record, manufacturer record, agency guidance, course synthesis, measurement, operational record, representation. The tier ranks authority within a class, and three classes carry no tier: measurement and operational records answer questions the ladder does not rank, and representations sit off it entirely as claims to be tested.Taught in CVT-101, CVT-102, CVT-103 +11 more
Special rating
A GVWR the manufacturer set below what the components would add up to. It may bind first; load position still determines the axle checks.Taught in CVT-104
Specification lifecycleeight stages
Eight stages from mission to in service, each closed by a gate.Taught in CVT-112
Speed symbol
The maker's speed rating: J 62, K 68, L 75, M 81 mph. Read against the truck's top speed.Taught in CVT-109
Spendablefor the day
Usable minus protected: the number a route plan may use.Taught in CVT-111
Spendable energy
Label × usable share × health × (1 − reserve). The only number that pays for a route.Taught in CVT-114
Split
A division of one platform's reading among the axles on it. Never a reading: an ASSUMPTION carried with the weigh that would retire it.Taught in CVT-105
Split-shaft
A PTO cut into the driveline. It disconnects the axles while engaged, so the truck works stationary only.Taught in CVT-110
Split-shaft PTO
A drive that takes the driveline for the pump, disconnecting the axles while engaged: stationary only by construction.Taught in CVT-110
SPN / FMI
The two halves of a fault code: what the fault is about (suspect parameter number) and how it failed (failure mode identifier).Taught in CVT-110
Spreadratio set
First-gear ratio divided by top-gear ratio. Q-1's six-speed: 5.48.Taught in CVT-107, CVT-114
Spread axle
Two axles more than 96 in apart: two single axles at 20,000 each, never a tandem, and outside the 36-ft exception.Taught in CVT-105
Spring-loaded bracketflexible mount
Brackets on the web and on the sill joined by a bolt and a high-compression spring. It holds the body down and lets the sill lift a little as the frame twists.Taught in CVT-106
Stability control
ABS plus steering, yaw and lateral sensing; it brakes single wheels to hold the path or slow a roll.Taught in CVT-108
Standby
Engine at low idle with no PTO: warning lights, cab heat, waiting. Lesson 102.5 files it as Idle and Engine-off on site as Dwell.Taught in CVT-110
Start-up (warm-up)
Heating cab and pack before the first mile; on the plug the grid pays.Taught in CVT-114
Startability
The ability to pull away from a dead stop at loaded weight, on the worst grade and surface the truck will face. Wants a deeper (numerically higher) ratio — the opposite end of the trade from cruise fuel.Taught in CVT-101, CVT-102, CVT-103 +11 more
Starting score
An Application Type’s forecast before any file exists. It chooses the first question; it never fills a line.Taught in CVT-114
State of health
The share of its starting energy a pack still has. Meaningless without its base and test conditions.Taught in CVT-114
State shareCALC-101-STATE-SHARE
State hours divided by total defined hours. A ratio of like quantities, therefore dimensionless and unit-invariant . Shares are only additive when they share a denominator.Taught in CVT-102, CVT-103, CVT-104 +10 more
Static stability factor
T ÷ 2h, in g: the lateral acceleration at which a rigid body's inside wheels lift. The ceiling, never the threshold.Taught in CVT-109
Stationframe-rail datum
A position along the truck in inches from a named zero, rearward: “station 44 behind the back of cab.”Taught in CVT-103
Stationary work
Work at zero road speed: unloading, pumping, lifting, packing.Taught in CVT-101, CVT-110
Status line
A rule written with its instrument, dates, scope, status as of a date, what is pending and what it does not establish.Taught in CVT-111
Steady-to-duty penalty
How far the whole day's mpg falls below the same truck's steady-speed mpg.Taught in CVT-107
Steer floorfederal weight rule
The lowest limit a State may enforce on a steering axle on the Interstate: the lower of 20,000 and the maker's axle rating. A limit on States, not capacity.Taught in CVT-105
Steering stops
Adjustable bolts at the axle that end the wheel's travel, set to keep tire clearance to fixed and moving parts.Taught in CVT-109
Stepratio set
One gear's ratio divided by the next. At unchanged road speed with no clutch or converter slip, engine rpm becomes rpm divided by the step. With slip, turbine speed and engine speed must be distinguished.Taught in CVT-107
Step-out
The rear swinging sideways because its tires spent their grip on slowing.Taught in CVT-108
StiffnessE and I
How far a rail deflects under a given load. Set by the metal's modulus E (about 29 million psi for any steel) and the section's I. Yield does not change it.Taught in CVT-106
Stop band
The from-the-hazard stop across the dry deceleration band (0.35–0.55 g). Kept in entry 108.1; never a screen line.Taught in CVT-108
Stop densityCALC-101-STOP-DENSITY
Counted stops divided by route distance. Unit-dependent, so the unit belongs in the label. Requires a stated counting rule — a delivery, a traffic signal and a break are not the same event.Taught in CVT-102, CVT-103, CVT-104 +10 more
Stop dwell
Time at the stops: how long the wheels stayed stopped at a counted stop. Not the Dwell state. Lesson 102.5 splits this stop time into unloading and engine-on waiting.Taught in CVT-102, CVT-103
Stop-work risk
A risk that must halt a decision now; said before Prove.Taught in CVT-101
Stopping distance from application
The standard's test distance, measured “from the point at which movement of the service brake control begins.” It includes the brake lag and leaves out the driver.Taught in CVT-108
Stopping distance from the hazard
The planning distance: perception and reaction, then brake lag, then braking. Always named with its start.Taught in CVT-108
Stress cell
a dated input the case is rerun at; a test, not a forecast.Taught in CVT-113
Stress concentration
The pile-up of stress at a hole's rim: 2.5–3 times open, 1.5–1.9 times with a tight Grade 8 bolt (rule of thumb).Taught in CVT-106
Stress raiser
A detail that piles stress up locally: a hole, a hole cluster, a weld toe, a square end.Taught in CVT-106
Structural stringSE-010, SE-046
UNRESOLVED: CONFIGURATION-SPECIFIC STRUCTURAL EVIDENCE REQUIRED: the line waits on the maker's or body builder's structural document for this configuration.Taught in CVT-106
Subframe
The body's own structure on the rails: two longsills and their cross members. It spreads loads; it is not a rating.Taught in CVT-106
Sum test · endpoint test
The two sanity tests. The reactions add to the gross and agree with the CG. A test weight at 0, WB/2 and WB lands as 0, half and all on the rear, with the right signs.Taught in CVT-104
Superelevation
The road's bank across a curve, as a fraction (6% = 0.06). Taken off the demand once, and only when surveyed.Taught in CVT-109
Supersede
Replace a claim by id, old value readable.Taught in CVT-101
Superseded claim
A claim replaced for current use by a revision or change event, and preserved in history rather than deleted . Superseding is what makes a revision reconstructible three weeks later; deleting is what makes it a rumor.Taught in CVT-102, CVT-103, CVT-104 +10 more
Support line
The distance, hours and capability between a failed system and the people who can fix it.Taught in CVT-102, CVT-103
Support PV
The present value of the support lines one option adds over the other (extra days down, hauls, repairs planned outside a printed term).Taught in CVT-113
SUPPORTED
A responsive, in-scope record agrees.Taught in CVT-101
Suspension rating
The load the maker stands behind at the axle. One link in the stack; the GAWR is the chassis maker's assigned rating; a stronger part never raises it.Taught in CVT-109
Sustained & peak grade
Sustained: held long enough that the truck climbs continuously, shown by a profile, not by two endpoints. Peak: the steepest short pitch. Each carries length, direction and load aboard.Taught in CVT-102, CVT-103
Swap test
Running each truck's powertrain in the other's job to see what gives first.Taught in CVT-107
Swept width
Wall-to-wall radius minus inside path: the pavement the turn uses.Taught in CVT-109
Swing clearancefifth wheel
Kingpin-to-cab-back-plane distance minus the trailer's front-corner swing radius, √(kingpin setting² + half-width²). Clearance to a plane, not to equipment.Taught in CVT-103
System
A group of parts that carries one job on the truck.Taught in CVT-101
S·O·L·TSpot, Open, Lock, Test
The qualified technician’s four controls on the truck, in order, with the discharge wait before Test.Taught in CVT-114

T

Table II
FMVSS 121's table of stopping distances by speed and vehicle type: single-unit trucks 310 ft loaded and 335 ft unloaded from 60 mph.Taught in CVT-108
Taglift axle
One of the record’s six fields, Tag 1 to Tag 6: Rated envelope, Vehicle form, Work package, Mission, Operating cycle, Energy system.Taught in CVT-101, CVT-105
Tag 6, two fields
Travel propulsion and body work power kept apart, each with its own carry, convert and refill.Taught in CVT-111
Tail swing
How far the rearmost point (OH behind the rear axle) swings outside the body side's path at full lock: √(R 0 ² + OH²) − R 0 . Here R 0 ≈ WB ÷ tan(inner wheel cut) + half the kingpin track + half the body width.Taught in CVT-103, CVT-109
Tailpipe, well-to-wheel, lifecycle
What leaves the truck; plus making and delivering the fuel or power; plus building and scrapping the vehicle.Taught in CVT-111
Take-back
The party bound, by contract or rule, to accept a pack at the end of its life. Ask who it is and what stands behind it.Taught in CVT-114
Tandemfederal definition
Two or more consecutive axles whose centers fit between planes more than 40 and not more than 96 in apart. Three axles inside 96 in are a tandem.Taught in CVT-105
Tandem center
Midpoint between two drives, used only to read a spec-sheet wheelbase. No axle sits on it.Taught in CVT-105
Tandem on paper
A pair the spacing makes a tandem though nobody calls it one, like unit 31's pusher and first drive, 60 in apart.Taught in CVT-105
Tandem reference point
Where a document ends its CA and WB on a tandem: the tandem center, the trunnion or the forward rear axle. Read it from the document; CT has no universal definition.Taught in CVT-103
Tank vehicle49 CFR 383.5
A CMV transporting liquid or gas in tank(s) with individual capacity over 119 gallons and aggregate capacity of 1,000 gallons or more, permanently or temporarily attached.Taught in CVT-102, CVT-103, CVT-104 +10 more
Taper
An end cut at 20–30° so the reinforcement hands its load back to the rail gradually.Taught in CVT-106, CVT-114
Tare
An empty weight, usable only with its condition.Taught in CVT-101, CVT-104
Tare / curb / empty weight
The vehicle's weight without payload, in a stated condition. Not established by the certification label. Requires a unit-specific weight record stating what was installed, fuel level, and date.Taught in CVT-102, CVT-103, CVT-104 +10 more
Tare gap
Electric tare minus the diesel twin’s; less the usable allowance, the cargo lost on a weigh-out load.Taught in CVT-114
Tare weight
Weight of the empty vehicle in a stated condition — what's installed, fuel and DEF level, occupants, tools, date. Tare with no condition stated is half a fact.Taught in CVT-102, CVT-103, CVT-104 +10 more
Taxable gross weightfederal tax rule
Actual unloaded weight fully equipped, including customary trailers, plus heaviest customary load; subject to the declaration floor, a tax basis.Taught in CVT-101, CVT-113
Technical defense
A 90-second account structured facts → assumptions → limits → request. Each assumption is stated together with what it is carrying; each request names an artifact and a holder.Taught in CVT-102, CVT-103, CVT-104 +10 more
Telematics device
A radio unit that reads the truck's network and reports out, from the diagnostic connector or behind the OEM gateway; some can transmit.Taught in CVT-110
Temperature factor
Share of the rating available: 1.00 at 80 °F, 0.65 near freezing, 0.40 at 0 °F (one maker's table).Taught in CVT-110
The 6-in band
A span 6 in or more past a whole foot: the State rounds up or down; the screen shows both and plans on the lower.Taught in CVT-105
The call
The 113.8 entry sentence: the recommendation, its open lines, and who decides.Taught in CVT-113
The file
The screen's entries side by side, each with its date, numbers and states, carried unchanged.Taught in CVT-113
The five H’s
Heat, Haste, Hold, Haul, Hardware: the aging dials.Taught in CVT-114
The four pipes
Truck acceptance, charger, cable, site share; the narrowest sets the time.Taught in CVT-114
The four questions
Q1 product · Q2 commerce or own-production delivery · Q3 exits 3a–3d · Q4 readiness, last.Taught in CVT-101
The four stamps
Edition, release date, applicability, supersedes.Taught in CVT-101
The gatemain contactors, pre-charge
Main contactors joining pack to bus, in the pack or the junction box. The BMS sets the power limit.Taught in CVT-114
The Load Ledger™
The axle-load working record this module builds, eight entries from the rating stack to the scale ticket.Taught in CVT-104
The lock
No GO while any factor is Unresolved, however high the floor.Taught in CVT-114
The RAIL
The four layers every weight number sits on: R ated · A s-built · I n-service · L egal. Name the rail before you use the number.Taught in CVT-102, CVT-103, CVT-104 +10 more
The Service FiveName, Stock, Time, Cover, Exit
Five service lines to put in writing before the order.Taught in CVT-114
The six domains
01 FreightFlow™ · 02 HeavyWorks™ · 03 CivicWorks™ · 04 FieldSystems™ · 05 CriticalMission™ · 06 PassengerSystems™ (boundary).Taught in CVT-101
The Spec Architect's recommendation
The Spec Architect's written call, line by line. The account decides release once each stage's certification documents arrive; certifiers close certification lines.Taught in CVT-106
This export
The scope of a missing channel: one file, not the truck.Taught in CVT-101
Three-way catalyst
The single catalyst on a spark-ignited engine at the correct fuel-air mixture. No DPF, SCR or DEF.Taught in CVT-111
Throughputthe battery’s odometer
Kilowatt-hours through the pack, capped in kWh or full-pack cycles.Taught in CVT-114
Tier
Inside a class: record, copy with locator, restatement.Taught in CVT-101
Tilt high point
The highest point a tilting cabover cab reaches, published with the pivot; 128 to 132 in in one medium-cabover book.Taught in CVT-103
Time fence
A date after which a manufacturer builds what the paper says: the chassis change cutoff and the body builder’s production freeze. A change answers to the fence of whoever builds the changed item.Taught in CVT-112
Time-fill
CNG straight from a compressor to every truck at once over the night; fills fuller.Taught in CVT-111
Time-weighted payloadCALC-101-WEIGHTED-PAYLOAD
The sum of payload times duration, divided by total duration. Must disclose its weighting basis: time-weighted and distance-weighted values diverge sharply on routes with long empty legs.Taught in CVT-102, CVT-103, CVT-104 +10 more
Tire cost per mile
(price on the truck − casing value at removal) ÷ miles to removal.Taught in CVT-113
Tire lineon the label
The tire size and cold pressure printed beside each GAWR. Not necessarily the fitted tire.Taught in CVT-104
Tire offset
How far the tire's center sits outboard of its kingpin, as the model uses it: about 6 in here, more for a wider tire or another wheel.Taught in CVT-109
Tire rev/mi
Turns per mile from the maker's data book for the exact product, new, at load. Never computed from diameter.Taught in CVT-107
Tongue / pin weight
The vertical download a trailer places on the hitch or fifth wheel. Transfers onto the towing unit's axles and counts against their ceilings.Taught in CVT-102, CVT-103, CVT-104 +10 more
Top-gear gradeability
The grade held in top gear at a stated speed and mass; here 62 mph at 34,300 lb.Taught in CVT-107
Torquelb-ft, N·m
Twist at the crankshaft at one rpm. Multiplied by gearing, it launches the truck.Taught in CVT-107
Torque converter
The fluid coupling that launches an automatic, multiplying torque while it slips (up to its stall torque ratio) and passing it at 1.0 once locked.Taught in CVT-107
Torque management
An engine calibration that limits torque in low gears or during shifts; a rating that depends on it holds only if the calibration carries it.Taught in CVT-107
Torque rise
(Peak torque − torque at rated) ÷ torque at rated. How much the twist climbs as a load drags rpm down from rated.Taught in CVT-107
Torque-limited startability
Launch torque × first gear × axle × efficiency ÷ rolling radius ÷ weight, less rolling.Taught in CVT-107
Torsion-stiff body
A closed box that barely twists: tanks, refuse bodies, steel dumps. It mounts flexibly at the front so the frame can twist under it.Taught in CVT-106
TRACE Request™
The five-part evidence request: T estable claim, R equired record, A pplicability keys, C ustodian, E ffect on the blocked decision. The Effect field is the one that gets it answered.Taught in CVT-101, CVT-102, CVT-103 +11 more
Trace, regression set
Each effect followed to every line, test and document it reaches; the set of checks re-run as a result.Taught in CVT-112
Track
The width the truck tips across. This module uses the rear dual-set center-to-center track, 72 in, and names it on every threshold.Taught in CVT-109
Traction-limited startability
Friction × drive-axle load ÷ weight, less rolling.Taught in CVT-107
Tractor-protection valve
Shuts the towing truck's air off from the trailer lines as pressure falls; the carrier towing rule gives 20–45 psi.Taught in CVT-108
Trade study
Every offered ratio through the same screens at the loaded states, with the choice and each reject's reason recorded.Taught in CVT-107
Trailer / semitrailer49 CFR 571.3
A trailer is drawn by another vehicle. A semitrailer rests a substantial part of its weight on the towing unit; a full/drawbar trailer carries its own weight on its own axles.Taught in CVT-102, CVT-103, CVT-104 +10 more
Trailer swing and jackknife
Trailer wheels lock first: the trailer swings out. Towing unit's drive wheels lock first: the rig folds at the hitch.Taught in CVT-108
Transfer piles
The three-way sort applied to a Spec DNA record crossing a jurisdiction: facts that survive intact, labels that change while the reality does not, and fields that must be re-sourced from the new jurisdiction's controlling instrument or left unresolved.Taught in CVT-102, CVT-103, CVT-104 +10 more
Transient
A swerve, slosh, curb strike, gust or brake application: faster than a steady curve; it can roll the truck below the static band.Taught in CVT-109
Transmit peak
A radio's current while keyed, well above its average. Peaks size fuses and wire; averages size amp-hours.Taught in CVT-110
Truck (straight / rigid)49 CFR 571.3
A powered motor vehicle, except a trailer, designed primarily to transport property or special-purpose equipment on its own frame. "Straight truck" = a rigid single-unit truck.Taught in CVT-102, CVT-103, CVT-104 +10 more
Truck acceptancebattery (BMS) limit
What the truck’s battery and BMS will take; on DC the onboard charger is bypassed.Taught in CVT-114
Truck state
One combination of load, lift-axle positions, slider setting and trailer. Each state gets its own screen.Taught in CVT-105
Truck tractor49 CFR 571.3
A truck built primarily to draw other vehicles and not constructed to carry a load other than part of the weight of the towed unit. Recognized by construction (fifth wheel), not by what's hitched.Taught in CVT-102, CVT-103, CVT-104 +10 more
Truck-day
One truck on one scheduled working day; the unit downtime is paid in.Taught in CVT-114
True tandem / spread pair
Two axles over 40 and up to 96 in apart / two axles more than 96 in apart, which are two single axles and never get the exception.Taught in CVT-105
Truth table
For each function: what must all be true, what cancels it, and its safe state on a fault.Taught in CVT-110
TSC1
The J1939 engine-speed request message. Whether the engine obeys one from the body is the OEM's decision.Taught in CVT-110
Turbine torque
Torque leaving the converter's turbine: engine torque times the converter's multiplication. The maker checks it.Taught in CVT-107
Turbine-driven / engine-driven PTO gear
Where a transmission PTO takes its drive. Converter turbine: speed changes with every shift and stops in gear at a standstill. Engine: engine speed times the ratio, in every gear.Taught in CVT-110
Turning center (O)
The point the truck pivots about at full lock, on the rear axle's line extended to the inside of the turn.Taught in CVT-109
Two-support modelFRM-001 v1
The frame as a beam on the steer axle and the tandem center, pusher raised. A course screen model, ASSUMPTION.Taught in CVT-106
Two-tandem exception36 ft
Two consecutive true tandems, first to last axle 36 ft or more, may carry 34,000 each: 68,000 on that four-axle group.Taught in CVT-105
Type 1, 2, 3federal multistage rule
Type 1: conforms if no alterations are made in identified components. Type 2: conforms under stated conditions of final manufacture. Type 3: no representation.Taught in CVT-106
Type 1, 2, 3 statement
Per standard: conforms if identified parts are left alone; conforms under stated conditions; no representation.Taught in CVT-101
Type 2 statement
An IVD statement of the conditions under which the completed vehicle will conform; the federal multi-stage rule defines it.Taught in CVT-112

U

U-bolt clamp
A U-bolt over the sill and rail with a one-piece spacer inside the rail and a hardwood sill of at least 0.5 in. It holds down by clamp force and resists fore-aft only by friction, so it needs a rear fishplate bracket or stops.Taught in CVT-106
Uncertainty band
The ± feet a verdict must clear to be a Margin: here ±1.0 ft, a screening band the course sets, not a measured accuracy.Taught in CVT-109
Undocumented swap
A different part built with no request, approver or date; found by the configuration audit.Taught in CVT-112
Unit of value
The unit of work the owner sells: a ton, a pull, a mile.Taught in CVT-113
Unit parity
The requirement that a calculation produce equivalent results across display modes within a declared tolerance. Verified by published test vectors; failure is a release blocker.Taught in CVT-102, CVT-103, CVT-104 +10 more
Unit-hour
One refrigeration unit running for one hour; pre-cool for 18 units at 1.5 h is 27.Taught in CVT-111
Unlabeled assumption
A value a line depends on that nobody wrote down.Taught in CVT-112
Unladen weight
Weight without cargo and, in most uses, without occupants. Exact inclusions vary with the governing definition; confirm which applies.Taught in CVT-102, CVT-103, CVT-104 +10 more
Unladen · laden
The completed truck empty, or loaded. On this truck’s suspension unladen is the tallest state and laden the lowest. Every height names one.Taught in CVT-103
Unloaded vehicle weightfederal definition
All fluids full, no cargo, occupants or removable accessories.Taught in CVT-101, CVT-104
Unmanaged peak
Every charger running at once: the sum of the chargers’ draw at the meter, 18 × 50 kW here.Taught in CVT-111
UNRESOLVED
A claim the available evidence cannot support. A correct and complete professional answer — not a failure to answer.Taught in CVT-101, CVT-102, CVT-103 +11 more
UNRESOLVED (placement)
The stalled question and the request that would settle it.Taught in CVT-101
Unresolved request
A named question, who holds the answer, and the decision it blocks. Never a blank, never “none.”Taught in CVT-102, CVT-103
Unsupported legal claim
A rule verdict with no citation, edition or owner. Recorded, given no weight.Taught in CVT-112
Unsupported rule claim
“Meets all DOT requirements”: no rule, edition or owner. In a bid, recorded and given no weight.Taught in CVT-112
Upfittertrade role
A business that installs bodies and equipment. Its rule role depends on what it does to each truck.Taught in CVT-101
Usable
What the system can deliver: the label less what fill limits, pressure floors and the maker's usable band keep back.Taught in CVT-111
Usable CAthis case’s term
CA less the space the body cannot use behind the cab. Documents print configuration-specific “effective CA”; read the one for the configuration ordered.Taught in CVT-103
Usable energythe window
The part the truck may use when new, set in BMS software. Published shares run 80.0% to 95.7%; no standard sets one.Taught in CVT-114
Usable payload
The largest cargo that keeps the gross and every axle within its rating, in every load state. Never larger than headroom.Taught in CVT-104
Usable reserve
Nameplate × temperature factor × allowed depth, computed for a named night.Taught in CVT-110
Utilization
the work a truck does in a year (haul days, miles, hours, loads), the divisor for every fixed cost.Taught in CVT-113

V

Validationmission tests
Proof the truck does its job where it will work; M1 to M5, buyer-run, before signature.Taught in CVT-112
Vehicle OAL
Bumper to the rearmost point of the finished truck, with any stowed device.Taught in CVT-103
Vehicle stage
UNBUILT (the evidence holds only an order or quote) · BUILT_INCOMPLETE (IVD) · COMPLETED (label). With no stage record, the unit’s current stage is UNRESOLVED.Taught in CVT-101
Vendor-neutral line
The job, its measure, condition and method, which any maker can meet with its own hardware.Taught in CVT-112
Verdict band
±2% of the table load: spare beyond it is a Margin, inside it No margin, a shortfall beyond it Over.Taught in CVT-109
Verdict survival
How far an assumed input would have to move before a conclusion built on it flips. A verdict that inherits an assumption is said in MARK, with that distance.Taught in CVT-102, CVT-103
Verificationcomponent checks
Proof a requirement line was met; C1 to C6 verify parts, truck parked.Taught in CVT-112
Verification / validation
Was the line met? Does the truck do its job on the route? C1–C6 and M1–M5 verify lines; M1–M5 also validate the job.Taught in CVT-112
Verification cross-reference
Each test against the lines it proves, so gaps show before delivery.Taught in CVT-112
Verification methodcourse order
Inspection, Analysis, Demonstration, Test. Chosen when the line is written.Taught in CVT-112
VINfederal VIN rule
Assigned by the incomplete vehicle manufacturer and kept by every later stage, alterers included.Taught in CVT-101
VIN match
Record VIN read against the truck by a named reader.Taught in CVT-101
Vocation
The application category in the maker's guide. Not the duty cycle, the route's operating states (CVT-102).Taught in CVT-107
Vocation Family™Level 2
Looked up after Level 1; never judged or recalled.Taught in CVT-101
Volume basis
Which volume a density divides by: packed cargo, usable internal, nominal external or bulk. Stated in the same field as the density.Taught in CVT-102, CVT-103
Volumetric efficiency
Share of the displacement that arrives as flow: 0.90 is this module's planning value for a new gear pump.Taught in CVT-110
V·D·RVehicle, Date, Reach
Three questions for any fire, crash or uptime number before it is repeated.Taught in CVT-114

W

W
The group’s federal figure in pounds, to the nearest 500, an exact half down. Never a rating, never a load.Taught in CVT-105
Waiver
The older word for a deviation granted during or after manufacture.Taught in CVT-112
Walking beam
A tandem suspension whose equalizing beam pivots between the axles; the maker claims an equal split, with no published tolerance.Taught in CVT-109
Wall-to-wall radius
The path of the outside front bumper corner (or any mirror or extension beyond it) at full lock.Taught in CVT-109
Warm-upalso start-up
Heating the cab and battery before the first mile. From the battery if unplugged; from the depot if done on the plug.Taught in CVT-111
Water-level load
Payload spread evenly through the body, so its CG sits at the body center (x 238.8 on this truck).Taught in CVT-104
WBWheelbase
Front axle centerline to rear axle centerline — or to the centerline of the rear axle group on a tandem. Confirm which on multi-axle vehicles.Taught in CVT-102, CVT-103, CVT-104 +10 more
WB · AF · chassis OAL
Wheelbase; rear axle centerline to end of frame (EOF); bumper face to end of frame.Taught in CVT-103
WB · CA
Front axle to rear axle centerline; back of cab to rear axle centerline (WB = AC + CA). “CA” is always the document’s CA.Taught in CVT-103
WB, BFAthis lesson's uses
WB: front axle centerline to rear axle centerline (280 in). BFA: front bumper to front axle centerline (43 in set forward; 48 in in the set-back what-if).Taught in CVT-109
Weakest input wins
A computed line takes the weakest state of its inputs.Taught in CVT-113
Weakest leg wins
The service factor is the weakest known of truck, shop and maker. A known Fails wins over blanks. Otherwise one blank caps it at Thin and blocks GO; two leave it Unresolved.Taught in CVT-114
Weakest link
The part whose rating or limit the duty reaches first.Taught in CVT-107
Weakest-input rule
A derived value takes the weakest evidence state among its inputs.Taught in CVT-111
Weather band
A temperature range priced as a percent over a 70°F day, picked by the coldest hour the truck works or sits unplugged.Taught in CVT-114
Web
The rail's tall vertical face. It holds the flanges apart and carries the shear between them; body-mounting holes go here and only here (106.3).Taught in CVT-106
Web, flangeframe rail
The web is the rail's tall vertical plate; the flanges are its top and bottom edges. The flanges carry most of the bending.Taught in CVT-106
Weigh out, cube out
The scale fills first, or the trailer does. Battery weight costs cargo only on the first.Taught in CVT-114
Weigh-out
Payload binds first: P below ρ × V.Taught in CVT-101
Weigh-out and cube-out
The scale tops out first, or the box fills first.Taught in CVT-114
Weight allowancefederal allowance
Up to 2,000 lb more on an electric power unit on the Interstate, never above 82,000 lb gross.Taught in CVT-114
Weight classNHTSA’s class table
The band a GVWR falls in: lettered A to H, then Classes 3 to 8. Trade shorthand: Classes 1 to 8.Taught in CVT-101
Weight creepbuilt · carried · next model
Weight a quote never carried: options and plug lines at the build, what the crew adds in service, and a replacement that weighs what its own build weighs.Taught in CVT-104
Weight transfer
Load a stop moves onto the front axle: gross × g × CG height ÷ wheelbase.Taught in CVT-108
Weighted payloadCALC-101-WEIGHTED-PAYLOAD
Σ(payload × weight) ÷ Σ(weight), weight = time or distance. Declares its basis, inherits its inputs' states, never screens capacity.Taught in CVT-102, CVT-103
Wheel cutinner wheel cut
The inside front wheel's maximum steer angle. Brochures and books print this wheel's angle.Taught in CVT-109
Wheel position
One end of an axle. A dual counts once; positions are twice the axles.Taught in CVT-101
Wheel stamp
The maximum load and cold pressure marked on a disc wheel: a rating separate from the tire's.Taught in CVT-109
Whichever first
an interval with several limits ends at the first one the truck reaches; due at the limit.Taught in CVT-113
Who, what, wheels, whenthe four W’s
Four questions that grade a claim: who measured it, what was measured, did a truck carry it, and when.Taught in CVT-114
Whole-chain efficiency
Useful power out divided by fuel power in, across engine, PTO, pump or alternator together. In this case, the reference electrical draw and planning fuel rates cap useful efficiency at about 12 % at work speed. About 4 % at low idle is fuel-to-12 V load power, not light output.Taught in CVT-110
Whole-platform group
A group made only of axles the ticket weighed as complete platforms. Its load is ticket arithmetic, FACT-derived about that truck on that day.Taught in CVT-105
Whole-vehicle headroom
GVWR minus a stated or weighed empty: a ceiling, never the payload.Taught in CVT-101
Wide-base single
One wide tire on a 14 in wheel in place of a dual pair; rated as a single only.Taught in CVT-109
WIM screening
A highway sensor’s dynamic reading, estimated to static; never a certified weighing.Taught in CVT-101
Work mode
The road speed at which a work function must run: stationary, creep, mobile, or pump-and-roll. A requirement recorded in the Mission Log™; the drive that delivers it is chosen in CVT-110.Taught in CVT-102, CVT-103, CVT-109 +1 more
Work-State Map™
The operating-state and body-control interface map this module builds, one entry per lesson; entry 110.1 holds the states and modes.Taught in CVT-110
Working time
Hours on the job; counts decide nothing until their hours are known.Taught in CVT-101
Worst planned day
The day the plan is sized to: the route log's 95th-percentile miles (128 here); on a battery, run in the coldest working hours, the worst planned cold day. Not the average day, not the longest ever.Taught in CVT-111
Worst stateper axle
The state with the highest load on that axle. Each axle has its own.Taught in CVT-104
Written approval
The maker's own signed answer to a named modification; the only evidence that settles a letter's condition.Taught in CVT-113

X

x
A load's distance behind the front-axle centerline in inches; negative ahead of it, more than WB behind the rear axle.Taught in CVT-104
x from the steer-axle centerline
This module's frame datum: inches rearward from the steer axle's centerline. Never a bare “station,” which in CVT-103 counts from the back of cab.Taught in CVT-106

Y

Yield strengthpsi; ksi in speech
The stress at which the rail keeps a set. 120 ksi = 120,000 psi. Read from the frame sheet, never defaulted; heat treatment raises it.Taught in CVT-106

0-9

"Up to" figure
A maker's best case; a FACT about the document, not a measurement of your truck.Taught in CVT-113
1% rule
The CVT-104 convention for a load against a rating: 1% or more over is Over; within 1% is No margin.Taught in CVT-108
12/34/34
The five-axle loading convention, 12,000 steer and 17,000 on each other axle. A planning habit, not a rule or a weighing.Taught in CVT-105
20-hour amp-hoursnameplate Ah
Amp-hours over 20 hours at 80 °F; about 100 Ah for a Group 31. Every budget starts here.Taught in CVT-110
30/30 spring-brake chamber
A Type 30 service chamber and a Type 30 spring chamber in one housing; the spring half is the parking brake.Taught in CVT-108
4x2 / 6x2 / 6x4
Total wheel positions × driven wheel positions (a dual counts once). 6x2 and 6x4 share a silhouette; only the driven-axle count differs.Taught in CVT-102, CVT-103, CVT-104 +10 more
4x2 · 6x4 · 6x2
Wheel positions by driven positions: a single driven rear axle; a tandem with both axles driven; three axles with one driven.Taught in CVT-103
“More than 8” row
Table B’s row just over 8 ft: 38,000 for two axles, 42,000 for three. Never the 34,000 tandem row.Taught in CVT-105

A definition is the easy part.